- ClassificationCategoryCybersecurityDomainCybersecurityFramework FamilyNIST Special Publications
- Regulatory ContextTypeControl FrameworkLegal InstrumentGuidelineSectorGovernment SectorIndustryGovernment & Public Sector
- Region / PublisherRegionNorth AmericaRegion DetailUnited StatesPublisherNational Institute of Standards and Technology (NIST)
- VersioningVersionRevision 4 (April 2013; updated January 22, 2015); withdrawn September 23, 2021Effective DateApril 2013Issue DateApril 2013 (updates through January 22, 2015)
- AdoptionAdoption ModelRegulatory ComplianceImplementation ComplexityHigh
- Official ReferenceOpen Link in New TabSource
License included / downloadable: Yes
The Rev. 4 high baseline is part of NIST SP 800-53 Rev. 4, archived by NIST as a withdrawn publication and available free of charge; NIST asserts no copyright over it in the United States.
Framework text is licensed by its publisher and is included only where stated above.
- The NIST SP 800-53 Rev. 4 high-impact baseline is historical; Rev. 4 was withdrawn September 23, 2021 and the current baseline sits in SP 800-53B.
- Rev. 4 assigned the high baseline to any system rated high on confidentiality, integrity, or availability under FIPS 199.
- NIST's OSCAL profile lists 343 items: 170 base controls and 173 enhancements, 83 more than the moderate baseline.
- Eleven base controls are selected at high only, including AC-10, AU-10, CA-8 Penetration Testing, SA-12 Supply Chain Protection, and SC-24 Fail in Known State.
- The high baseline is not a pure superset of moderate; CM-7 takes different enhancements at each level.
Overview
NIST SP 800-53 Revision 4 was withdrawn on September 23, 2021 and superseded by NIST SP 800-53 Rev. 5, so the high-impact security control baseline described on this page is a historical one; its current counterpart is the high baseline in NIST SP 800-53B. Rev. 4 assigned the high baseline to any system that FIPS 199 rated high on confidentiality, integrity or availability, the top of the FIPS 200 high water mark (Section 3.1); the parent Rev. 4 page covers the catalog as a whole.
NIST's OSCAL profile of the Rev. 4 high baseline (version 2015-01-22) lists 343 items: 170 base controls and 173 control enhancements, 83 more than the moderate baseline. Eleven base controls are selected at high and nowhere else in Table D-2: AC-10 Concurrent Session Control, AU-10 Non-repudiation, CA-8 Penetration Testing, PE-18 Location of Information System Components, SA-12 Supply Chain Protection, SA-15 Development Process, Standards, and Tools, SA-16 Developer-Provided Training, SA-17 Developer Security Architecture and Design, SC-3 Security Function Isolation, SC-24 Fail in Known State and SI-6 Security Function Verification. The other 72 additions are enhancements, among them IR-2 (1) (2), CP-2 (2) (4) (5), CP-4 (2), AU-9 (2) (3), CM-5 (1) (2) (3) and RA-5 (4).
The high baseline is not a pure superset of moderate: Table D-2 gives CM-7 Least Functionality the enhancements (1) (2) (4) at moderate and (1) (2) (5) at high, and Appendix D's statement that the baselines are hierarchical refers to the strength of each control's requirements rather than to identical enhancement lists. Tailoring under Section 3.2 still applies, including the downgrading of single-objective controls when only one objective is high, but each decision needs a risk-based rationale in the security plan (Section 3.4), and Section 3.1 warns that where insider threats, advanced persistent threats, classified information or cross-domain connections apply, controls beyond any baseline are likely to be needed.
Why does it matter?
A high rating on one objective is enough: a system whose loss of availability would be severe takes the whole high baseline even if its confidentiality is low, because FIPS 200 uses the high water mark and Section 3.1 of Rev. 4 maps that level to the high column of Appendix D. The baseline is where Rev. 4 placed its developer-facing and supply chain controls (SA-12, SA-15, SA-16, SA-17), its strongest contingency and audit enhancements and its only penetration testing control (CA-8). Systems authorized at high under Rev. 4 carry the largest packages to migrate, and their assessment records still cite these identifiers.
Key benefits include:
- Developer and supply chain controls arrive
SA-12 Supply Chain Protection, SA-15, SA-16 and SA-17 are Not Selected at low and moderate and selected at high (Table D-2), the first point at which Rev. 4 made these obligations part of a baseline.
- Penetration testing becomes baseline
CA-8 Penetration Testing is selected only in the high column, so a high system is tested beyond control-by-control review.
- Contingency planning at full strength
The high baseline adds thirteen Contingency Planning enhancements to the moderate set, including CP-2 (2) (4) (5), CP-4 (2), CP-6 (2), CP-7 (4), CP-8 (3) (4) and CP-9 (2) (3) (5).
- Audit records protected and attributable
AU-10 Non-repudiation, AU-5 (1) (2) and AU-9 (2) (3) are selected only at high, alongside AU-12 (1) (3) and AU-6 (5) (6).
- A direct Rev. 5 successor
SP 800-53B keeps the trigger (any objective high), and NIST's OSCAL Release 5.2.0 profile of the Rev. 5 high baseline holds 188 controls and 182 enhancements.
How does it work?
Categorization decides the baseline. Under FIPS 199 the organization rates confidentiality, integrity and availability for every information type the system processes, stores or transmits, takes the highest value per objective as the system's security category, and takes the highest of the three as the FIPS 200 impact level; the Implementation Tip in Section 3.1 lays out these four steps. If any objective is high, the system is high-impact and the organization selects the high column of Table D-2 (RMF Step 2). National security systems follow CNSS Instruction 1253 instead.
Reading the high column shows how the baseline grows. Controls present at every level gain enhancements, so IR-2 Incident Response Training is the base control at low and moderate and IR-2 (1) (2) at high, CP-9 Information System Backup moves from (1) at moderate to (1) (2) (3) at high, and CM-8 Information System Component Inventory from (1) (3) (5) to (1) (2) (3) (4) (5). Eleven base controls appear for the first time, and CM-7 swaps enhancement (4) for (5). The Table D-1 priority code on each row orders implementation, P1 before P2 before P3, while P0 marks catalog controls such as SA-13 Trustworthiness and SA-18 Tamper Resistance and Detection that no baseline selects.
Tailoring follows Section 3.2: designate common controls, apply scoping considerations, select compensating controls from Appendix F, assign parameter values, supplement the baseline and add specification detail. The security objective-related considerations apply to high systems too: where a system is high only for confidentiality, controls that support availability alone, such as CP-2 (2), CP-4 (2) and CP-9 (2) (3) (5), may be downgraded to the moderate entry under three conditions. Section 3.4 requires the tailored baseline and the rationale in the security plan, and Section 3.3 lets a community of interest publish an overlay so the same decisions are made once.
Key Elements
- Trigger (Section 3.1)
At least one FIPS 199 objective rated high; the FIPS 200 high water mark gives a high impact level and the high column of Appendix D.
- Size (OSCAL profile, version 2015-01-22)
343 items: 170 base controls and 173 control enhancements, 83 more than the moderate baseline (11 base controls and 72 enhancements).
- Eleven high-only base controls (Table D-2)
AC-10, AU-10, CA-8, PE-18, SA-12, SA-15, SA-16, SA-17, SC-3, SC-24 and SI-6, each Not Selected at low and moderate.
- High-only enhancements (Table D-2)
Seventy-two, for example AC-2 (5) (11) (12) (13), AC-6 (3), CM-5 (1) (2) (3), CM-6 (1) (2), CP-2 (2) (4) (5), IR-4 (4), MA-4 (3), MP-6 (1) (2) (3), SC-7 (8) (18) (21) and SI-7 (2) (5) (14).
- CM-7 Least Functionality
Enhancements (1) (2) (4) at moderate and (1) (2) (5) at high, the one place where the high column replaces a moderate enhancement rather than adding to it.
- Priority codes (Table D-1)
The code on each Table D-2 row sequences the work, P1 ahead of P2 ahead of P3, while P0 identifies catalog controls outside every baseline.
- Security plan (Section 3.4)
Records the tailored high baseline, each tailoring rationale and any use restrictions, for the authorizing official.
What does it cover?
The Rev. 4 high baseline applied to federal information systems, other than national security systems, that FIPS 199 placed at high on at least one objective; the Authority page permits voluntary use by nongovernmental organizations, and CNSS Instruction 1253 governs national security systems. It is a security baseline only: the Appendix J privacy controls were selected under the SAOP/CPO without regard to impact level. Since the withdrawal on September 23, 2021 the baseline cannot start a new selection, as FIPS 200 requires the most current version of SP 800-53 as amended, but it remains the reference for high systems whose authorization packages, assessment reports and contracts still name it.
What are its objectives?
Within the Rev. 4 selection process the high baseline exists to:
Provide the initial control set for a high-impact system, where a loss of any one objective could have severe consequences (Sections 2.3 and 3.1).
Bring developer, supply chain, penetration testing and fail-safe controls (SA-12 to SA-17, CA-8, SC-24) into the baseline for the first time.
Strengthen controls present at lower levels through 72 further enhancements, in audit, contingency planning, configuration and media protection in particular.
Serve as the starting point for tailoring, downgrading of single-objective controls and supplementation under Section 3.2.
Give the authorizing official a security plan that records the final control set and the reasoning behind it (Section 3.4).
Framework in Context
The high baseline was chosen at RMF Step 2 of SP 800-37 Rev. 1 and assessed with SP 800-53A Rev. 4. Its successor is the high baseline in SP 800-53B, triggered by Section 2.2 of that publication on the same rule and listed by NIST's OSCAL Release 5.2.0 profile at 370 items (188 controls and 182 enhancements); the Rev. 5 version adds SA-21 Developer Screening and SR-9 Tamper Resistance and Detection as high-only controls, moves SA-12 into the new Supply Chain Risk Management family and selects SA-15 from moderate upward, with the SP 800-53B privacy baseline applying in addition. Authorization today runs under SP 800-37 Rev. 2.
Common Framework Mappings
The Rev. 4 high baseline is commonly mapped to the frameworks and authorization programs that used it as their top tier while it was current, so that high-level evidence can be reused across assessments.
Mapped frameworks include:
CIS Controls v8.1
CSA CCM v4
FedRAMP Rev. 5
FISMA
ISO 27001:2022
NIST CSF 2.0
PCI DSS 4.0.1
SOC 2
How SmartSuite Supports NIST SP 800-53 Rev. 4 (High Baseline)
SmartSuite provides the system for managing controls, evidence, mappings, assessments, and reporting.
Use Compliance Management for the 170 controls and 173 enhancements of a high system, with the developer and penetration testing obligations tracked as their own records, Third Party Risk Management for the SA-12 supply chain protections that reach suppliers, and Internal Audit Management to plan the CA-8 penetration tests and control assessments.
High Baseline Register
Load the 170 controls and 173 enhancements from the Table D-2 high column as records with family, number, priority code and implementation status.
Developer Obligations (SA-15 to SA-17)
Track the development process, developer training and security architecture evidence that these high-only controls require, by development contract and system.
Supply Chain Protection (SA-12)
Hold the SA-12 protections in Third Party Risk Management by supplier and component, with the assessment and monitoring status of each.
Penetration Testing (CA-8)
Schedule the penetration tests the high baseline requires, record scope and findings, and link each finding to the control it concerns.
Tailoring and Downgrade Record
Record each Section 3.2 decision, including CM-7 (5), any single-objective downgrade and every compensating control, with the rationale and the approving official (Section 3.4).
Map to the Rev. 5 High Baseline
Link each record to its SP 800-53B high counterpart and track the gap to the 188 controls and 182 enhancements in the current profile.
Related frameworks

CIS Controls v8.1 is a prioritized set of 18 Controls and 153 Safeguards, in three Implementation Groups, with a new Govern function.

FedRAMP Rev5 is the legacy FedRAMP certification type: NIST SP 800-53 Rev. 5 baselines, 3PAO assessment and agency authorization for cloud services used by U.S. agencies.

HITRUST CSF v11.5.0 (April 2025) is HITRUST's certifiable security and privacy framework: 14 control categories, e1, i1 and r2 assessments; superseded by v11.9.0.

ISO/IEC 27001:2022 specifies requirements for an information security management system: Clauses 4 to 10, risk treatment, the Statement of Applicability and 93 Annex A controls.

ISO/IEC 27002:2022 is the reference set of 93 information security controls in four themes, with attributes and implementation guidance, that supports an ISO/IEC 27001 ISMS.

NIST CSF 2.0 (CSWP 29, February 26, 2024) is the voluntary cybersecurity framework with six Functions including Govern, 22 Categories, 106 Subcategories, Profiles and Tiers.
Frequently Asked Questions For NIST SP 800-53 Rev. 4 (High Impact Baseline)
Section 3.1 applies the FIPS 200 high water mark: a system is high-impact when at least one of confidentiality, integrity or availability is rated high under FIPS 199, whatever the other two ratings are. The organization then selects the high column of Table D-2 in Appendix D as its initial baseline and tailors it under Section 3.2.
NIST's OSCAL profile of the Rev. 4 high baseline (version 2015-01-22) lists 343 items: 170 base controls and 173 control enhancements. That is 83 more than the moderate baseline, made up of 11 base controls and 72 enhancements, according to the same OSCAL source; Table D-2 is the printed listing.
Eleven base controls: AC-10 Concurrent Session Control, AU-10 Non-repudiation, CA-8 Penetration Testing, PE-18 Location of Information System Components, SA-12 Supply Chain Protection, SA-15 Development Process, Standards, and Tools, SA-16 Developer-Provided Training, SA-17 Developer Security Architecture and Design, SC-3 Security Function Isolation, SC-24 Fail in Known State and SI-6 Security Function Verification, each shown as Not Selected at low and moderate in Table D-2. Seventy-two enhancements are high-only as well, such as IR-2 (1) (2), CP-4 (2) and AU-9 (2) (3).
Almost. Appendix D says the baselines are hierarchical in the strength of each control's requirements, and every moderate item except one also appears at high. The exception is CM-7 Least Functionality: Table D-2 selects enhancements (1) (2) (4) at moderate and (1) (2) (5) at high, so a system moving from moderate to high replaces (4) with (5) rather than adding to it.
In NIST SP 800-53B, published with SP 800-53 Rev. 5 when the baselines were taken out of the catalog. Section 2.2 of SP 800-53B keeps the same trigger, Tables 3-1 to 3-20 list the high column, and NIST's OSCAL Release 5.2.0 profile holds 188 controls and 182 enhancements; Release 5.2.0 of August 27, 2025 made no changes to the baselines. Rev. 4 was withdrawn on September 23, 2021.

Put this framework to work in SmartSuite
Manage controls, risks, evidence, and audits in one platform designed for modern governance, risk, and compliance.


