NIST SP 800-53B, Control Baselines for Information Systems and Organizations: Moderate-Impact Baseline
  • Classification
    Category
    Cybersecurity
    Domain
    Cybersecurity
    Framework Family
    NIST Special Publications
  • Regulatory Context
    Type
    Control Framework
    Legal Instrument
    Standard
    Sector
    Government Sector
    Industry
    Government & Public Sector
  • Region / Publisher
    Region
    North America
    Region Detail
    United States
    Publisher
    National Institute of Standards and Technology (NIST)
  • Versioning
    Version
    Revision 5 baselines (October 2020; Release 5.2.0 August 27, 2025, no baseline changes)
    Effective Date
    October 29, 2020
    Issue Date
    October 29, 2020 (errata December 10, 2020)
  • Adoption
    Adoption Model
    Regulatory Compliance
    Implementation Complexity
    High
  • Official Reference
License Information

License included / downloadable: Yes

NIST SP 800-53B, with the moderate baseline tables, the control baselines spreadsheet and the OSCAL profiles, is available free of charge from NIST.

Framework text is licensed by its publisher and is included only where stated above.

Official Resources
NIST Special Publication 800-53B
Defines control baselines for information systems in moderate impact environments.
NIST SP 800-53 Revision 5
Defines the security and privacy controls for federal information systems.
NIST Risk Management Framework (RMF) Overview
Describes the integration of NIST SP 800-53 controls within the Risk Management Framework.
Key takeaways
  • The NIST SP 800-53B moderate-impact baseline applies when at least one FIPS 199 objective is moderate and none is high.
  • NIST's OSCAL Release 5.2.0 profile lists 287 items: 177 base controls and 110 enhancements from 18 of the 20 Rev. 5 families.
  • Against the 149-item low baseline it adds 138 items, including AC-4, AC-5, AC-6, CP-7, IA-12 Identity Proofing, and SC-28.
  • Access Control is the largest family at 39 items, followed by System and Communications Protection, Configuration Management, Identification and Authentication, and Contingency Planning.
  • The same 287-item starting point applies whether the system is moderate on one objective or all three.

Overview

This page covers the moderate-impact security control baseline in NIST SP 800-53B, Control Baselines for Information Systems and Organizations: the baseline a federal system takes when at least one of its FIPS 199 security objectives (confidentiality, integrity or availability) is rated moderate and none is rated high (Section 2.2). The SP 800-53B parent page describes the publication with all four of its baselines, and the high baseline has its own page. NIST released SP 800-53B on October 29, 2020 alongside the NIST SP 800-53 Rev. 5 catalog, issued an errata update on December 10, 2020, and on August 27, 2025 published Release 5.2.0, a version-number change that includes no changes to the baselines.

In NIST's OSCAL Release 5.2.0 profile, the moderate baseline holds 287 controls and control enhancements: 177 base controls and 110 enhancements from 18 of the 20 Rev. 5 families, with Access Control the largest at 39 items, then System and Communications Protection (25), Configuration Management (24), Identification and Authentication (24) and Contingency Planning (23). Against the 149-item low baseline it adds 138 items: 46 base controls, among them AC-4 Information Flow Enforcement, AC-5 Separation of Duties, AC-6 Least Privilege, CP-7 Alternate Processing Site, IA-12 Identity Proofing and SC-28 Protection of Information at Rest, and 92 enhancements such as AC-2(5) Inactivity Logout, CA-7(1) Independent Assessment and IR-4(1) Automated Incident Handling Processes.

Section 1.1 gives the baseline its force: implementing a minimum set of controls selected from SP 800-53 Rev. 5 is mandatory for federal information systems under OMB Circular A-130 and FISMA, and any other organization that processes, stores or transmits information may use the baseline voluntarily. The 287 items are a starting point rather than the finished control set. The organization tailors them through the Section 2.4 activities, may downgrade controls that support only one security objective where its FIPS 199 categorization allows, and documents each decision with its risk-based justification in the system security and privacy plans. The privacy control baseline is selected separately for systems that process PII, irrespective of impact level.

Why does it matter?

The moderate baseline sits between the 149-item low baseline and the 370-item high baseline, and Section 2.2 fixes which systems start from it: FIPS 199 rates each security objective, FIPS 200 applies the high water mark, and a system with at least one moderate objective and no high objective selects the Mod column of Tables 3-1 to 3-20. The same 287-item starting point applies whether the system is moderate on confidentiality alone or on all three objectives, which is why Section 2.4 matters as much as the tables: it is the tailoring guidance that turns the column into a documented, defensible control set that an authorizing official can approve in the system security and privacy plans.

Key benefits include:

  • A trigger in the publication's own words

Section 2.2 defines a moderate-impact system as one in which at least one security objective is moderate and no security objective is high, using the high water mark concept from FIPS 199 and FIPS 200.

  • A fixed starting set

The 177 controls and 110 enhancements are marked with an x in the Mod column of Tables 3-1 to 3-20, and NIST's OSCAL profile of the moderate baseline carries the same list in machine-readable form.

  • Room to downgrade with conditions

Section 2.4 lists controls that support only confidentiality, only integrity or only availability, so a moderate system that is low on availability can consider downgrading items such as CP-2(1) when three stated conditions are met.

  • Inheritance reduces the work

Section 2.4 lets common controls inherited from another provider count for the system, so account, physical and contingency controls run once by the organization need not be re-implemented.

  • Unchanged since 2020

NIST's planning note of August 27, 2025 says Release 5.2.0 of SP 800-53B includes no changes to the baselines, so a tailoring record built on the December 10, 2020 errata edition remains current.

How does it work?

Selection starts with security categorization. Section 2.2 explains that FIPS 199 rates each system low, moderate or high for confidentiality, integrity and availability, and that FIPS 200 applies the high water mark to set one impact level; a system is moderate-impact when its highest rating is moderate. The organization then reads the Mod column of the Chapter Three tables, one per family from Table 3-1 Access Control to Table 3-20 Supply Chain Risk Management: an x marks a control or enhancement in the baseline, and a W marks a control withdrawn from the catalog, such as MP-2(2), MP-4(1) and MP-5(4), each incorporated into SC-28(1). Not every control in SP 800-53 is assigned to a baseline.

The Mod column shows where a moderate system carries more than a low one. In Access Control it adds AC-2(1) to AC-2(4) for automated account management, AC-6 Least Privilege with six enhancements including AC-6(9) logging of privileged functions, and AC-17(1) to AC-17(4) for remote access. Audit and Accountability gains AU-6(1), AU-6(3) and AU-7 Audit Record Reduction and Report Generation. Contingency Planning adds CP-6 Alternate Storage Site, CP-7 Alternate Processing Site, CP-8 Telecommunications Services and CP-2(1), (3) and (8). System and Communications Protection adds the boundary enhancements SC-7(3), (4), (5), (7) and (8) plus SC-8(1) and SC-28(1) cryptographic protection; System and Information Integrity adds SI-4(2), (4) and (5) and SI-7(1) and (7); Supply Chain Risk Management adds SR-6 Supplier Assessments and Reviews.

Tailoring follows under Section 2.4: common controls, scoping considerations, compensating controls, organization-defined parameter values, supplementation and specification detail. The security objective scoping consideration is written for this baseline: when a system is moderate because confidentiality or integrity is moderate but availability is low, availability-only items such as CP-2(1), CP-6, CP-7, CP-8, MA-6 and PE-11 may be downgraded to their low-baseline entries, provided the downgrade reflects the FIPS 199 category for that objective, is supported by an organizational assessment of risk and does not reduce protection of security-relevant information. Every control is accounted for, and the rationale is recorded in the system security and privacy plans and approved by the responsible officials. Appendix C adds overlays, such as the SP 800-82 Rev. 3 OT overlay for moderate systems, shared through the Security Control Overlay Repository.

Key Elements

  • Trigger (Section 2.2)

At least one FIPS 199 security objective rated moderate and none rated high; the FIPS 200 high water mark sets the impact level and selects the Mod column of Chapter Three.

  • Size (OSCAL Release 5.2.0 profile)

287 items: 177 base controls and 110 control enhancements from 18 families; 138 more than the low baseline and 83 fewer than the high baseline.

  • Base controls that enter at moderate (Tables 3-1 to 3-20)

46, including AC-4, AC-5, AC-6, AC-11, AC-12, AC-21, AU-7, CM-3, CM-9, CM-12, CP-6, CP-7, CP-8, IA-3, IA-12, IR-3, MA-3, MA-6, MP-3, MP-4, MP-5, PE-4, PE-5, PE-9, PE-10, PE-11, PE-17, PL-8, RA-9, SA-10, SA-11, SA-15, SC-2, SC-4, SC-8, SC-10, SC-17, SC-18, SC-23, SC-28, SI-7, SI-8, SI-10, SI-11, SI-16 and SR-6.

  • Enhancements that enter at moderate

92, for example AC-2(1) to (5) and (13), AC-6(1), (2), (5), (7), (9) and (10), AC-17(1) to (4), AU-6(1) and (3), CA-7(1), CM-2(2), (3) and (7), CM-7(1), (2) and (5), CP-9(1) and (8), IA-5(2) and (6), IR-6(1) and (3), SC-7(3), (4), (5), (7) and (8), SC-8(1), SC-28(1) and SI-4(2), (4) and (5).

  • Downgrade candidates (Section 2.4)

Confidentiality-only items such as AC-21, MP-3, MP-4, MP-5, PE-4, PE-5 and SC-4; integrity-only items such as SI-7, SI-7(1) and SI-10; availability-only items such as CP-2(1), CP-6, CP-7, CP-8, MA-6, PE-9, PE-10 and PE-11.

  • Tailoring record (Section 2.4)

Common control designations, scoping decisions, compensating controls with rationale, parameter values, supplements and specification detail, all documented in the system security and privacy plans and approved by responsible officials.

  • Overlays and capabilities (Appendix C, Section 2.5)

Overlays carry a community's tailoring of the baseline, registered in the Security Control Overlay Repository; capabilities group mutually reinforcing controls before selection.

What does it cover?

SP 800-53B applies to federal information systems, which footnote 3 of Section 1.1 defines as systems used or operated by an agency, by a contractor of an agency, or by another organization on behalf of an agency, and the moderate baseline applies to those categorized moderate under FIPS 199 and FIPS 200. National security systems are outside FISMA and follow CNSS Policy 22 and CNSS Instruction 1253 (footnote 4). Section 1.1 also says the baselines can be implemented by any organization that processes, stores or transmits information, including state, local and tribal governments and the private sector, and that the privacy control baseline, which runs alongside this one for systems that process PII, is not mandated by law or OMB Circular A-130.

What are its objectives?

Section 1.1, the abstract and Chapter Two set out what the moderate baseline is for:

Give every system categorized moderate under FIPS 199 and FIPS 200 one defined starting set of security controls and enhancements (Section 2.2, Tables 3-1 to 3-20).

Satisfy the OMB Circular A-130 and FISMA requirement for a minimum set of controls selected from SP 800-53 Rev. 5 (Section 1.1).

Provide the working assumptions behind the baseline, such as general-purpose, networked, multi-user systems, so organizations know when it does not fit (Section 2.3).

Support tailoring that is defensible, risk-based and documented in the system security and privacy plans, including downgrades for single-objective controls (Section 2.4).

Enable overlays and capability-based selection so communities of interest can adapt the moderate baseline once and reuse it (Section 2.5, Appendix C).

Framework in Context

Every item in the moderate baseline comes from the SP 800-53 Rev. 5 catalog, and SP 800-53A Rev. 5 supplies the assessment procedures; the CSRC record lists both as publication parts of SP 800-53B. Tailoring sits in SP 800-37 Rev. 2 Tasks P-4 and S-2 (footnote 26), and SP 800-18 guides the system security plan that holds the tailoring record (footnote 28). The high baseline adds 83 items on top of this one. For operational technology, Appendix F of SP 800-82 Rev. 3 publishes an overlay of this baseline whose Table 22 moderate column adds CP-12 Safe Mode, SI-17 Fail-Safe Procedures, MA-7 Field Maintenance, AU-4(1), AC-17(10), CP-10(6), SR-5(1) and SC-7(18), an enhancement SP 800-53B assigns to high only.

Common Framework Mappings

The SP 800-53B moderate baseline is commonly mapped to the authorization programs and control frameworks that reuse Rev. 5 control identifiers, so one moderate control set and its evidence can serve several obligations.

Mapped frameworks include:

CIS Controls v8.1

COBIT 2019

FedRAMP Rev. 5

HIPAA (NIST SP 800-66 Rev. 2)

HITRUST CSF v11.5

ISO 27001:2022

NIST CSF 2.0

PCI DSS 4.0.1

SOC 2

SMARTSUITE

How SmartSuite Supports NIST 800-53B Rev. 5 (Moderate Baseline)

SmartSuite provides the system for managing controls, evidence, mappings, assessments, and reporting.

Use Compliance Management to hold the 177 controls and 110 enhancements of a moderate system with the Section 2.4 tailoring record and parameter values beside each one, Cyber & IT Risk to link the FIPS 199 categorization and the risk assessment that supports every downgrade, Third Party Risk Management for SR-6 supplier assessments and IR-6(3) supply chain coordination, and Internal Audit Management for the CA-2(1) and CA-7(1) independent assessments the baseline requires.

Moderate Baseline Register (Tables 3-1 to 3-20)

Load the 177 controls and 110 enhancements as records keyed by Rev. 5 identifier, with family, Mod-column marking, owner and implementation status for each system.

Categorization Record (Section 2.2)

Hold the FIPS 199 impact value for confidentiality, integrity and availability, the high water mark result and the finding that no objective is high, as the evidence that the moderate baseline applies.

Tailoring Record and System Security Plan (Section 2.4)

Record each control's common, hybrid or system-specific designation, scoping ground, compensating-control rationale, parameter values and supplements, with the approving official, in the form the plans must carry.

Security Objective Downgrades

Track the availability-only, confidentiality-only and integrity-only candidates from Section 2.4, such as CP-2(1), CP-7, MP-5 and SI-7, with the FIPS 199 category, the risk assessment and the protection finding that each downgrade needs.

Supplier and Independent Assessments (SR-6, CA-2(1), CA-7(1))

Keep SR-6 supplier assessments in Third Party Risk Management and plan the independent assessors and assessments that CA-2(1) and CA-7(1) require in Internal Audit Management, linked to the controls they cover.

Overlay Application (Appendix C)

Record any overlay applied to a moderate system, such as the SP 800-82 Rev. 3 OT overlay, with the controls it adds to or removes from the baseline and the OT-specific parameter values.

Related frameworks

CIS Controls v8.1

CIS Controls v8.1 is a prioritized set of 18 Controls and 153 Safeguards, in three Implementation Groups, with a new Govern function.

FedRAMP Rev. 5 Moderate

The FedRAMP Rev5 Moderate baseline is the set of 323 NIST SP 800-53 Rev. 5 controls a cloud service must implement and have assessed for moderate-impact federal data.

ISO 27001:2022

ISO/IEC 27001:2022 specifies requirements for an information security management system: Clauses 4 to 10, risk treatment, the Statement of Applicability and 93 Annex A controls.

ISO 27002:2022

ISO/IEC 27002:2022 is the reference set of 93 information security controls in four themes, with attributes and implementation guidance, that supports an ISO/IEC 27001 ISMS.

NIST CSF 2.0

NIST CSF 2.0 (CSWP 29, February 26, 2024) is the voluntary cybersecurity framework with six Functions including Govern, 22 Categories, 106 Subcategories, Profiles and Tiers.

NIST 800-37 Rev.2

NIST SP 800-37 Rev. 2 is the NIST Risk Management Framework: seven steps from Prepare to Monitor, with the tasks, roles and authorization decisions federal agencies apply under OMB A-130.

NIST 800-53 Rev.5

NIST SP 800-53 Rev. 5 is the NIST catalog of security and privacy controls in 20 families, mandatory for federal systems under OMB A-130 and FISMA; Release 5.2.0 issued August 27, 2025.

FAQ

Frequently Asked Questions For NIST SP 800-53B Rev. 5 (Moderate Impact Baseline)

Section 2.2 defines a moderate-impact system as one in which at least one of the three FIPS 199 security objectives, confidentiality, integrity or availability, is rated moderate and no objective is rated high. The high water mark concept from FIPS 199 and FIPS 200 sets the system's impact level, and the organization selects the Mod column of Tables 3-1 to 3-20 as its initial baseline before tailoring under Section 2.4.

NIST's OSCAL Release 5.2.0 profile of the moderate baseline lists 287 controls and control enhancements: 177 base controls and 110 enhancements from 18 of the 20 SP 800-53 Rev. 5 families. Access Control is the largest family with 39 items, followed by System and Communications Protection with 25, and Configuration Management and Identification and Authentication with 24 each. The printed source is Chapter Three of SP 800-53B, where an x in the Mod column marks each selected item.

The moderate baseline has 138 more items than the 149-item low baseline: 46 base controls and 92 enhancements. The base controls include AC-4 Information Flow Enforcement, AC-5 Separation of Duties, AC-6 Least Privilege, CM-3 Configuration Change Control, CP-6, CP-7 and CP-8 for alternate sites and telecommunications, IA-12 Identity Proofing, SC-8 Transmission Confidentiality and Integrity, SC-28 Protection of Information at Rest and SR-6 Supplier Assessments and Reviews. The enhancements include AC-2(1) to (5), AC-6(1), (2), (5), (7), (9) and (10), AC-17(1) to (4), CA-7(1), SC-7(3), (4), (5), (7) and (8), SC-8(1), SC-28(1) and SI-4(2), (4) and (5).

It can downgrade them, with conditions. Section 2.4 gives the example of a system categorized moderate because confidentiality or integrity is moderate while availability is low, and says availability-only items such as CP-2(1) may be downgraded to the low-baseline control. The downgrade must reflect the FIPS 199 security category for that objective, be supported by an organizational assessment of risk and not reduce protection of security-relevant information, and the rationale is recorded in the system security and privacy plans. Candidates listed in Section 2.4 include CP-2(1), (3) and (8), CP-6, CP-7, CP-8, MA-6, PE-9, PE-10 and PE-11.

Appendix C of SP 800-53B describes overlays as tailored control sets for a community of interest, and Appendix F of NIST SP 800-82 Rev. 3 publishes one for operational technology that starts from the SP 800-53B baselines. Its Table 22 moderate column adds CP-12 Safe Mode, SI-17 Fail-Safe Procedures, MA-7 Field Maintenance and AU-4(1), which the overlay adds to all three OT baselines, plus AC-17(10), CP-10(6), SR-5(1) and SC-7(18), the last of which SP 800-53B assigns to the high baseline only. Overlays are registered in NIST's Security Control Overlay Repository.

Put this framework to work in SmartSuite