GRC Program Health Checklist: 25 Questions to Ask This Quarter

Use this GRC program health checklist to assess owners, risks, controls, evidence, issues, vendors, incidents, dashboards, decisions, and Connected GRC maturity.
Category
Checklist & Toolkits
Stage
Improve
Product Group
GRC & Resilience

A GRC program can look healthy from the outside and still be fragile underneath.

The dashboard is published.
The risk register is updated.
The control library exists.
Evidence requests are moving.
Issues are being tracked.
Audits are in progress.
Vendors are being reviewed.
Policies are being refreshed.
Executives are receiving reports.

But a closer look may reveal a different story.

Risks have stale owners.
Controls are mapped to frameworks but not evidence.
Evidence is submitted but not accepted.
Issues are closed without validation.
Vendors are reviewed but not linked to critical services.
Incidents are closed without root cause.
Dashboards are green but source records are weak.
Risk acceptance is approved by email.
The board sees status but not decisions.
The operating committee reviews metrics but does not remove blockers.

That is why every Connected GRC program needs a recurring health check.

Not a once-a-year maturity assessment.
Not a long transformation diagnostic.
Not a generic audit of the GRC function.

A practical quarterly GRC program health checklist should answer one question:

Can the organization trust its GRC operating model to support decisions?

This checklist is designed for that purpose.

Use it each quarter to test whether your GRC program is connected, owned, evidenced, remediated, monitored, and decision-ready.

What is GRC program health?

GRC program health is the degree to which a governance, risk, compliance, audit, control, evidence, issue, vendor, incident, policy, privacy, AI, resilience, and reporting program is operating with clear ownership, reliable data, connected workflows, defensible evidence, effective remediation, and decision-ready dashboards.

A healthy GRC program can show:

  • who owns risks, controls, evidence, issues, vendors, and decisions

  • which risks are outside appetite

  • which controls are operating

  • which evidence has been accepted

  • which issues are overdue

  • which remediation has been validated

  • which vendors create material exposure

  • which incidents changed the risk view

  • which dashboards are built from reliable source records

  • which decisions need executive attention

An unhealthy GRC program may still be busy.

But it struggles to show whether the work is reducing risk, improving assurance, or helping leaders make decisions.

OCEG’s definition of GRC is useful here because it frames GRC as integrated capabilities that help the organization reliably achieve objectives, address uncertainty, and act with integrity. That means GRC program health should not be measured only by activity. It should be measured by whether the program helps the organization operate with better visibility, accountability, and evidence.

Who should use this checklist?

This checklist is useful for:

  • GRC program owners

  • Chief Risk Officers

  • Chief Compliance Officers

  • CISOs

  • General Counsel

  • CFOs and SOX leaders

  • Internal audit leaders

  • Third-party risk leaders

  • Privacy leaders

  • AI governance leaders

  • Operational resilience leaders

  • Connected GRC operating committees

  • Executive risk committees

  • Board and audit committee reporting teams

The checklist can be used in three ways:

  1. Quarterly program review: Use all 25 questions to assess program health.

  2. Monthly operating committee prep: Use selected questions to prepare agenda items.

  3. Roadmap planning: Use weak answers to prioritize the next 30, 60, or 90 days.

The goal is not to score perfectly.

The goal is to identify where the operating model needs attention.

How to use the checklist

For each question, rate the answer:

RatingMeaning
GreenThe program has reliable records, owners, workflows, evidence, and reporting
YellowThe program has partial coverage, inconsistent data, or manual workarounds
RedThe program lacks ownership, evidence, workflow, source-record trust, or decision support

Then assign:

  • owner

  • issue or improvement action

  • due date

  • dashboard impact

  • executive decision needed, if any

Do not let the checklist become another static assessment.

If a question is yellow or red, create an action.

A healthy GRC program uses health checks to improve the operating model.

The 25-Question GRC Program Health Checklist

1. Do material risks have clear owners?

A healthy GRC program can show who owns each material risk.

Risk ownership should not be vague.

“IT,” “Compliance,” or “the business” is not enough for material risks.

The program should show:

  • risk owner

  • executive owner, where appropriate

  • mitigation owner

  • KRI owner

  • review date

  • appetite status

  • linked controls

  • linked issues

  • linked incidents

  • linked vendors, where relevant

If material risks do not have clear owners, the program has an accountability gap.

Healthy answer: Each material risk has a named owner, current review date, appetite status, mitigation plan, and connected records.

Warning sign: Risks are reviewed in workshops but not owned in the operating model.

2. Can executives see which risks are outside appetite?

Risk appetite should not live only in a board-approved document.

Executives should be able to see:

  • risks outside appetite

  • risks approaching tolerance

  • risks with worsening KRIs

  • accepted risks nearing expiration

  • risks with overdue remediation

  • risks affected by incidents or vendors

  • decisions needed

If the program cannot quickly show which risks are outside appetite, risk reporting is probably too static.

Healthy answer: Risk appetite status appears in dashboards and is reviewed in the monthly or quarterly GRC review.

Warning sign: Risk ratings exist, but appetite thresholds are not measurable or connected to workflow.

3. Are controls mapped to risks and obligations?

A control library is only useful if controls connect to why they exist.

Controls should map to:

  • risks

  • obligations

  • policies

  • frameworks

  • evidence

  • tests

  • issues

  • owners

A control that maps only to a framework row may not be meaningful enough.

A control that maps to a risk, obligation, evidence requirement, and test procedure is much stronger.

Healthy answer: Key controls are mapped to risks, obligations, frameworks, evidence, owners, and test procedures.

Warning sign: The control library has many controls but weak risk or obligation mapping.

4. Are key controls supported by accepted evidence?

Evidence submitted is not the same as evidence accepted.

A healthy program distinguishes:

  • requested

  • submitted

  • under review

  • accepted

  • rejected

  • resubmission required

  • expired

  • reused

For key controls, executives should know whether accepted evidence exists for the current period.

Healthy answer: Key controls have accepted evidence, reviewer status, period, scope, and issue linkage where evidence fails.

Warning sign: Dashboards count submitted evidence as complete evidence.

5. Are evidence requirements clear to control owners?

Many evidence problems are not control-owner problems.

They are expectation problems.

A healthy program defines:

  • what evidence is required

  • what period it covers

  • what population it must include

  • who provides it

  • who reviews it

  • what counts as accepted

  • what causes rejection

If control owners have to guess what evidence is needed, the program will create rework.

Healthy answer: Evidence requirements are documented in the control record and visible before the request is sent.

Warning sign: Evidence requirements are described differently in emails, audit request lists, and testing workpapers.

6. Is evidence being reused responsibly across frameworks?

Evidence reuse is one of the strongest signs of Connected GRC maturity.

But reuse must be governed.

The program should know:

  • which evidence supports multiple frameworks

  • whether the evidence period aligns

  • whether the scope aligns

  • whether the evidence has been accepted

  • whether sharing restrictions apply

  • whether framework-specific notes are needed

SmartSuite’s Compliance Management page describes shared controls, centralized evidence, and real-time dashboards as part of connected compliance workflows. That is the kind of model evidence reuse requires.

Healthy answer: Reusable evidence is linked to controls, frameworks, periods, reviewers, and acceptance status.

Warning sign: Teams reuse files from folders without confirming period, scope, or acceptance.

7. Are issues linked to risks, controls, evidence, and root cause?

An issue tracker is not enough.

Issues should connect to:

  • source

  • affected risk

  • affected control

  • affected obligation

  • evidence gap

  • root cause

  • owner

  • remediation plan

  • due date

  • validation method

  • residual risk

  • dashboard status

If issues are not connected to risks and controls, executives cannot see impact.

If issues are not connected to root cause, the same problems will repeat.

Healthy answer: Issues are connected to source records and categorized by root cause.

Warning sign: Issues are tracked as tasks with owners and dates but no risk, control, or root-cause context.

8. Are high-severity issues overdue?

A healthy GRC program knows which high-severity issues are overdue and why.

The dashboard should show:

  • issue owner

  • risk impacted

  • control impacted

  • due date

  • days overdue

  • remediation status

  • validation status

  • escalation path

  • decision needed

Overdue high-severity issues should not sit quietly in a tracker.

They should appear in the monthly review, executive scorecard, and board reporting where appropriate.

Healthy answer: High-severity overdue issues are visible, escalated, and assigned to accountable owners.

Warning sign: Issue reports show closure counts but do not highlight overdue high-risk items.

9. Are issues closed only after remediation is validated?

Issue closure is one of the most misleading GRC metrics.

A program may show strong closure rates while risk remains unresolved.

A healthy program separates:

  • remediation planned

  • remediation in progress

  • remediation complete

  • evidence submitted

  • validation pending

  • validation passed

  • validation failed

  • closed

  • risk accepted

For material issues, closure should require validation.

Healthy answer: High-risk or material issues cannot close without validation evidence or approved risk acceptance.

Warning sign: Issue owners can mark issues closed without independent review or evidence.

10. Are repeat issues and findings visible?

Repeat issues are risk intelligence.

They show that the program may not be addressing root cause.

A healthy program tracks:

  • repeat control failures

  • repeat audit findings

  • repeat evidence rejections

  • repeat vendor issues

  • repeat incidents

  • repeat policy exceptions

  • repeat remediation extensions

Repeat issues should be reviewed by the operating committee.

They may indicate:

  • weak control design

  • unclear ownership

  • unrealistic policy

  • insufficient resources

  • poor training

  • weak validation

  • inadequate automation

Healthy answer: Repeat issues are identified, grouped by root cause, and escalated when needed.

Warning sign: Similar issues appear every cycle but are treated as new problems each time.

11. Are vendors connected to contracts, criticality, evidence, and issues?

Vendor risk should not be a standalone spreadsheet.

A healthy vendor record should show:

  • business owner

  • contract owner

  • risk tier

  • criticality

  • service provided

  • data access

  • system access

  • contract

  • evidence

  • cyber review

  • privacy review

  • business continuity review

  • open issues

  • incidents

  • renewal date

  • risk acceptance

If a vendor supports a critical service, processes sensitive data, or has system access, that relationship should be visible.

Healthy answer: Critical vendors are linked to contracts, evidence, issues, renewals, services, and risk decisions.

Warning sign: Vendor reviews are complete, but no one can show which vendors support critical services or have open issues before renewal.

12. Are incidents linked to root cause, controls, issues, and remediation?

Incident closure should not be the end of the workflow.

A healthy incident record should connect to:

  • affected asset

  • affected business service

  • affected vendor

  • affected data

  • severity

  • response timeline

  • legal or privacy review

  • root cause

  • failed controls

  • issues created

  • remediation

  • validation

  • lessons learned

  • dashboard impact

An incident that does not create learning is a missed opportunity.

Healthy answer: Material incidents are linked to root cause, control impact, remediation, and lessons learned.

Warning sign: Incidents are closed in the ticketing system but do not update risks, controls, or issues.

13. Are regulatory changes converted into operational action?

Regulatory change should not stop at legal interpretation.

A healthy regulatory change workflow should show:

  • source

  • impacted obligation

  • impacted entity or business unit

  • impacted policy

  • impacted control

  • owner

  • due date

  • evidence required

  • issue or action plan

  • implementation status

  • dashboard status

Legal interpretation is necessary.

But implementation requires owners, controls, evidence, and follow-up.

Healthy answer: Regulatory changes are mapped to obligations, policies, controls, owners, evidence, and issues.

Warning sign: Regulatory changes are tracked in legal notes but not linked to operational workflow.

14. Are policy exceptions and risk acceptances governed?

A healthy program does not approve exceptions and accepted risks informally.

Policy exceptions should include:

  • requirement excepted

  • business justification

  • risk assessment

  • approver

  • conditions

  • compensating controls

  • expiration

  • evidence

  • issue link

Risk acceptance should include:

  • risk accepted

  • residual risk

  • approver

  • rationale

  • evidence

  • conditions

  • expiration or review date

  • monitoring requirement

Accepted risk should appear in dashboards when material.

Healthy answer: Exceptions and accepted risks are time-bound, evidenced, approved, monitored, and dashboarded.

Warning sign: Exceptions and risk acceptances are approved by email and not reviewed again.

15. Are dashboards built from trusted source records?

A dashboard is only as trustworthy as its source data.

A healthy dashboard should have:

  • defined owner

  • defined audience

  • approved source records

  • refresh cadence

  • drill-down

  • threshold logic

  • data-quality notes

  • decisions-needed view

If dashboards are manually assembled from spreadsheets, emails, and status meetings, the program should be transparent about that limitation.

Healthy answer: Dashboards drill down to connected source records.

Warning sign: Dashboard colors are debated because teams do not trust the underlying records.

16. Are dashboard metrics tied to decisions?

GRC dashboards should not only report status.

They should support decisions.

A dashboard should show:

  • risk acceptance requested

  • remediation extension requested

  • vendor renewal with open risk

  • funding needed

  • policy exception approval

  • control failure escalation

  • board reporting item

  • regulatory response approval

  • AI use-case decision

  • operational resilience investment decision

A dashboard without decisions may still be useful.

But a dashboard with decisions becomes a management tool.

Healthy answer: Dashboards show decisions needed, owners, due dates, and evidence.

Warning sign: Dashboards show red, yellow, and green metrics but no clear action.

17. Are roles and responsibilities clear across the Three Lines?

A healthy GRC program preserves role clarity.

Management owns risks, controls, evidence, vendors, and remediation.

Risk and compliance teams define standards, monitor, test, challenge, and coordinate.

Internal audit provides independent assurance.

The IIA’s Three Lines Model reinforces the need for coordination without unnecessary duplication, overlap, or gaps.

Healthy answer: The RACI defines owners, reviewers, approvers, validators, and escalation paths.

Warning sign: Compliance or internal audit becomes the owner of management’s risks, controls, or remediation.

18. Is the GRC operating committee making decisions, not just reviewing status?

A healthy operating committee should resolve cross-functional issues.

It should make or route decisions such as:

  • risk acceptance

  • remediation prioritization

  • vendor approval with open issues

  • control redesign

  • policy exception

  • dashboard threshold change

  • issue escalation

  • funding request

  • board escalation

If the committee only reviews updates, it is not creating enough value.

Healthy answer: The committee maintains a decision log, action log, and escalation path.

Warning sign: The same red items appear every month with no decision or escalation.

19. Can the program explain what changed this quarter?

A quarterly health check should show movement.

Ask:

  • Which risks increased?

  • Which risks decreased?

  • Which controls failed?

  • Which evidence improved?

  • Which issues were validated?

  • Which vendors became more critical?

  • Which incidents changed risk posture?

  • Which dashboards became more reliable?

  • Which old processes were retired?

  • Which decisions were made?

A healthy program can explain change.

An unhealthy program reports static status.

Healthy answer: The quarterly review highlights movement, causes, actions, and decisions.

Warning sign: Reports look similar each quarter and do not explain what changed.

20. Are top risks connected to KRIs, controls, issues, and incidents?

Enterprise risk should not be isolated from operating data.

A healthy risk record should connect to:

  • KRIs

  • controls

  • evidence

  • issues

  • incidents

  • vendors

  • mitigation plans

  • risk acceptance

  • dashboards

SmartSuite’s Enterprise Risk Management page describes linking risks to controls, issues, remediation actions, KRIs, mitigation plans, and dashboards in a connected workspace.

Healthy answer: Top risks are supported by operating data and reviewed regularly.

Warning sign: Risk ratings are updated through workshops but not tied to controls, issues, or incidents.

21. Are critical services, assets, and vendors connected?

Connected GRC should show operational dependencies.

For critical services, the program should know:

  • service owner

  • business process

  • supporting assets

  • supporting vendors

  • data involved

  • recovery requirements

  • continuity plans

  • incident history

  • open issues

  • resilience test results

If cyber, vendor, and resilience records are disconnected, management may miss material exposure.

Healthy answer: Critical services are linked to assets, vendors, risks, incidents, and resilience evidence.

Warning sign: Vendor and cyber risks are reported without business service impact.

22. Are AI, privacy, and data risks connected to the broader GRC model?

AI and privacy governance should not live outside Connected GRC.

A healthy program connects:

  • AI use cases

  • AI vendors

  • data used

  • privacy reviews

  • cyber reviews

  • legal reviews

  • risk tiering

  • controls

  • evidence

  • monitoring

  • issues

  • approvals

  • dashboards

Privacy records should also connect data, processing activities, vendors, incidents, controls, and issues.

Healthy answer: AI and privacy risks are linked to owners, controls, evidence, issues, vendors, and executive reporting.

Warning sign: AI and privacy reviews happen in separate tools or documents with no connection to issue remediation or dashboards.

23. Are old spreadsheets and shadow workflows being retired?

Connected GRC maturity depends on retiring old systems of record.

If old spreadsheets remain active, the program may create duplicate truth.

A quarterly health check should ask:

  • Which spreadsheets are still active?

  • Which workflow do they support?

  • Why have they not been retired?

  • What source record replaced them?

  • Who still uses them?

  • What cutoff date exists?

  • What risk do they create?

Healthy answer: Legacy trackers are frozen, archived, or retired as connected workflows go live.

Warning sign: The platform exists, but the real work still happens in spreadsheets and email.

24. Is GRC data quality measured and improved?

Data quality is not administrative cleanup.

It is program health.

A healthy program tracks:

  • records missing owners

  • stale risk records

  • controls without evidence requirements

  • issues closed without validation

  • vendors without risk tier

  • incidents without root cause

  • evidence without period or reviewer

  • dashboards without drill-down

  • duplicate records

  • missing relationships

Data quality should be part of the monthly or quarterly review.

Healthy answer: Data-quality defects are dashboarded, assigned, and remediated.

Warning sign: Leaders distrust reports because source records are stale, incomplete, or inconsistent.

25. Can the program produce one connected risk story for executives and the board?

This is the final test.

A healthy Connected GRC program can produce one coherent risk story.

It can explain:

  • what changed

  • what matters

  • what is outside appetite

  • what evidence supports the conclusion

  • what controls are failing

  • what issues are overdue

  • what remediation has been validated

  • what vendors or incidents changed risk

  • what risks have been accepted

  • what decisions are needed

  • what the board should know

If risk, cyber, compliance, audit, vendor, privacy, AI, and resilience teams each produce disconnected reports, the program is not fully connected.

Healthy answer: Executive and board reporting uses connected source records and presents one aligned risk story.

Warning sign: The board receives multiple GRC narratives that do not reconcile.

Summary Checklist Table

Use this summary version in quarterly reviews.

#Health QuestionGreen / Yellow / RedOwnerAction
1Do material risks have clear owners?
2Can executives see risks outside appetite?
3Are controls mapped to risks and obligations?
4Are key controls supported by accepted evidence?
5Are evidence requirements clear to control owners?
6Is evidence reused responsibly across frameworks?
7Are issues linked to risks, controls, evidence, and root cause?
8Are high-severity issues overdue?
9Are issues closed only after remediation is validated?
10Are repeat issues and findings visible?
11Are vendors connected to contracts, criticality, evidence, and issues?
12Are incidents linked to root cause, controls, issues, and remediation?
13Are regulatory changes converted into operational action?
14Are policy exceptions and risk acceptances governed?
15Are dashboards built from trusted source records?
16Are dashboard metrics tied to decisions?
17Are roles and responsibilities clear across the Three Lines?
18Is the operating committee making decisions, not just reviewing status?
19Can the program explain what changed this quarter?
20Are top risks connected to KRIs, controls, issues, and incidents?
21Are critical services, assets, and vendors connected?
22Are AI, privacy, and data risks connected to the broader GRC model?
23Are old spreadsheets and shadow workflows being retired?
24Is GRC data quality measured and improved?
25Can the program produce one connected risk story for executives and the board?

How to interpret the results

Mostly green

The program is operating with strong connected discipline.

Next step:

  • optimize dashboards

  • automate repeat workflows

  • improve evidence reuse

  • mature board reporting

  • refine predictive KRIs

  • expand into adjacent workflows

Many yellow items

The program has structure but inconsistent execution.

Next step:

  • prioritize 3 to 5 improvement actions

  • clean ownership

  • fix evidence standards

  • improve issue validation

  • strengthen dashboard source records

  • use the operating committee to remove blockers

Several red items

The program may be activity-heavy but not decision-ready.

Next step:

  • focus on foundational records

  • define owners

  • clean statuses

  • connect risks, controls, evidence, and issues

  • launch one workflow properly

  • retire duplicate trackers

  • rebuild executive reporting around source records

Do not try to fix everything at once.

Pick the highest-value improvement and make it visible.

What to do after the health check

A health check should produce action.

After completing the checklist:

  1. Identify the top five red or yellow areas.

  2. Assign accountable owners.

  3. Create improvement issues or roadmap items.

  4. Define what evidence will prove improvement.

  5. Add the items to the monthly Connected GRC review.

  6. Update dashboards.

  7. Escalate decisions to executives or the operating committee.

  8. Review progress next quarter.

The checklist is only useful if it changes the operating model.

Common mistakes to avoid

Mistake 1: Treating the checklist as a survey

Do not collect answers and stop.

Turn weak answers into actions.

Mistake 2: Scoring everything green because a process exists

A process is not healthy unless it is owned, evidenced, connected, and used.

Mistake 3: Ignoring data quality

Dashboards and reports are only as reliable as the source records.

Mistake 4: Measuring activity instead of health

Controls tested, vendors reviewed, and issues closed are useful metrics, but they do not prove health by themselves.

Mistake 5: Letting the GRC team own every gap

Business owners, control owners, risk owners, vendor owners, and executives must own their parts.

Mistake 6: Not involving internal audit appropriately

Internal audit can provide valuable assurance and insight, but management should own remediation and operational control responsibilities.

Mistake 7: Reviewing the checklist once a year

Program health should be reviewed quarterly, with key exceptions reviewed monthly.

Quarterly GRC Health Review Agenda

Use this agenda with the checklist.

TimeTopicPurpose
0–10 minDecisions neededAddress urgent governance decisions first
10–20 minRisks outside appetiteReview risk movement and appetite exceptions
20–30 minControls and evidenceReview failed controls, evidence gaps, and evidence quality
30–40 minIssues and remediationReview overdue, repeat, and unvalidated issues
40–50 minVendors, incidents, and resilienceReview dependency and operational risk
50–60 minData quality and dashboard trustReview source-record defects
60–70 minOperating model gapsReview roles, workflows, and legacy trackers
70–80 minActions and ownersAssign actions and decisions
80–90 minExecutive / board itemsConfirm escalation and reporting items

This turns the checklist into a working meeting.

A practical test for your GRC program

Pick one executive GRC dashboard.

Ask whether it can show:

  • risks outside appetite

  • key controls without accepted evidence

  • high-severity issues overdue

  • issues pending validation

  • critical vendors with open risk

  • incidents linked to root cause

  • accepted risks nearing expiration

  • policy exceptions

  • data-quality gaps

  • decisions needed

  • source-record drill-down

If it cannot, the program may be reporting GRC activity without enough Connected GRC health.

That is common.

It is also the opportunity.

Final thought

A GRC program is healthy when leaders can trust it.

Trust does not come from a polished dashboard.

It comes from clear ownership, reliable data, connected records, accepted evidence, validated remediation, visible risk appetite, governed exceptions, monitored vendors, linked incidents, and decision-ready reporting.

This checklist helps test whether those foundations are in place.

The goal is not to answer every question perfectly.

The goal is to find the weak points before they become audit surprises, regulatory fire drills, board concerns, vendor failures, cyber incidents, or repeated control breakdowns.

Connected GRC program health is not about having more GRC activity.

It is about having better GRC confidence.

What is owned.
What is proven.
What is broken.
What is fixed.
What is accepted.
What is overdue.
What changed.
What decision is needed.

That is what this checklist should reveal.

Table of Contents
Related Product Areas

Linked Articles

GRC & Resilience
How to Measure Connected GRC Program Health

Learn how to measure Connected GRC program health using practical metrics for ownership, data quality, controls, evidence, issues, adoption, assurance, and reporting.

Read Article
arrow_forward
GRC & Resilience
The Connected GRC Scorecard: Metrics Executives Should Actually Trust

Learn how to build a Connected GRC scorecard executives can trust by measuring risk appetite, evidence, issues, remediation, validation, vendors, AI, cyber, and decisions.

Read Article
arrow_forward
GRC & Resilience
How to Run a Monthly Connected GRC Review

Learn how to run a monthly Connected GRC review that connects risks, controls, evidence, issues, vendors, AI, cyber, privacy, resilience, risk acceptance, and dashboards.

Read Article
arrow_forward
GRC & Resilience
GRC Data Quality: Why Owners, Statuses, and Relationships Matter

Learn why GRC data quality depends on clear owners, statuses, relationships, evidence, issue lifecycle, risk acceptance, and dashboards executives can trust.

Read Article
arrow_forward
GRC & Resilience
The Connected GRC Data Model: The Records Every Program Needs

Learn the core records every Connected GRC program needs, including risks, obligations, controls, evidence, issues, vendors, incidents, assets, audits, and dashboards.

Read Article
arrow_forward
GRC & Resilience
The Connected GRC Program Charter: Roles, Responsibilities, and Decision Rights

Learn how to build a Connected GRC program charter that defines scope, roles, responsibilities, decision rights, ownership, escalation, dashboards, and governance.

Read Article
arrow_forward
GRC & Resilience
How to Build a GRC RACI That Actually Works

Learn how to build a practical GRC RACI that clarifies owners, approvers, reviewers, evidence responsibilities, issue remediation, risk acceptance, and executive reporting.

Read Article
arrow_forward
GRC & Resilience
Evidence Management in GRC: Building an Audit-Ready Evidence Trail

Learn how evidence management works in Connected GRC by linking evidence to controls, obligations, tests, audits, issues, remediation, owners, periods, and approvals.

Read Article
arrow_forward
GRC & Resilience
Issue Remediation and Validation: How to Prove the Fix Worked

Learn how issue remediation and validation work in Connected GRC by linking findings, root cause, owners, remediation plans, evidence, retesting, validation, and risk reduction.

Read Article
arrow_forward
GRC & Resilience
Risk Acceptance in GRC: When to Accept Risk and How to Prove It Was Approved

Learn when to accept risk in GRC and how to prove approval with owners, rationale, compensating controls, evidence, expiration, monitoring, and dashboards.

Read Article
arrow_forward
GRC & Resilience
How to Clean Up a Messy Control Library

Learn how to clean up a messy control library by removing duplicates, separating requirements from controls, fixing ownership, mapping evidence, and improving GRC reporting.

Read Article
arrow_forward
GRC & Resilience
From Spreadsheet GRC to Connected GRC: A Migration Playbook

Learn how to migrate from spreadsheet-based GRC to Connected GRC by cleaning records, defining owners, linking risks, controls, evidence, issues, vendors, and dashboards.

Read Article
arrow_forward
GRC & Resilience
GRC Dashboards: Reporting Risk, Controls, Issues, and Evidence Without Creating Noise

Learn how to design GRC dashboards that connect risks, controls, issues, evidence, audits, vendors, incidents, and decisions without overwhelming leaders.

Read Article
arrow_forward
GRC & Resilience
How to Build a Connected GRC Operating Committee

Learn how to build a Connected GRC operating committee that connects risk, compliance, audit, cyber, privacy, third-party risk, resilience, evidence, issues, and decisions.

Read Article
arrow_forward
GRC & Resilience
How to Create a GRC Roadmap That Doesn’t Become a Transformation Theater

Learn how to create a practical GRC roadmap that delivers real operating value by connecting risks, controls, evidence, owners, issues, remediation, dashboards, and decisions.

Read Article
arrow_forward

Frequently Asked Questions

Answers to common questions about SmartSuite’s pricing models, plan options, and onboarding programs.

What is a GRC program health checklist?

A GRC program health checklist is a practical set of questions used to assess whether a GRC program has clear ownership, reliable data, connected workflows, accepted evidence, validated remediation, trusted dashboards, and decision-ready reporting.

How often should a GRC health check be performed?

A full GRC health check should usually be performed quarterly, with key exceptions, overdue issues, evidence gaps, and risks outside appetite reviewed monthly through the Connected GRC operating rhythm.

Who should own GRC program health?

The GRC program owner should coordinate program health, but risk owners, control owners, evidence owners, issue owners, vendor owners, business leaders, and executives must own their respective records and decisions.

What are the most important GRC program health indicators?

Important indicators include risks outside appetite, key controls with accepted evidence, high-severity issues overdue, issues closed with validation, repeat findings, critical vendors with open risk, dashboard source-record trust, and decisions needed.

How do you know if a GRC dashboard can be trusted?

A GRC dashboard can be trusted when it is built from approved source records, has current owners, defined statuses, valid relationships, accepted evidence, drill-down capability, and visible data-quality limitations.

What is the biggest warning sign of poor GRC program health?

The biggest warning sign is when dashboards look green but source records are stale, evidence is unaccepted, issues are unvalidated, ownership is unclear, and executive decisions are not visible.

How does Connected GRC improve program health?

Connected GRC improves program health by linking risks, controls, evidence, issues, vendors, incidents, policies, obligations, dashboards, and decisions into one operating model.

What should happen after a GRC health check?

Weak areas should become assigned improvement actions with owners, due dates, evidence of completion, dashboard visibility, and operating committee review.