How to Implement Connected GRC in 90 Days Without Boiling the Ocean
Most GRC transformations fail for a simple reason.
They try to fix everything at once.
The team starts with an ambitious vision.
Risk, compliance, audit, third-party risk, cyber, privacy, operational resilience, SOX, SOC 2, ESG, AI governance, regulatory change, policies, controls, evidence, issues, incidents, vendors, assets, and dashboards all go into the first implementation plan.
The scope becomes too large.
The data model becomes too complex.
The team debates taxonomy for weeks.
Every function wants its workflow included.
Control owners get pulled into design meetings.
Dashboards are designed before the source records are clean.
Executives wait for value.
The project slows down.
That is how teams boil the ocean.
Connected GRC should not start that way.
A successful 90-day implementation does not try to implement every GRC workflow across the whole enterprise. It proves the connected model with one or two high-value workflows, a clear data model, real owners, usable evidence, issue remediation, and decision-ready dashboards.
The goal of the first 90 days is not perfection.
The goal is to create a working Connected GRC foundation that shows people:
- how risks connect to controls
- how controls connect to evidence
- how evidence connects to testing
- how failed tests create issues
- how issues connect to remediation
- how remediation connects to validation
- how dashboards show what needs action
- how leadership gets better decisions from connected records
That is enough to create momentum.
Then the program can expand.
What does it mean to implement Connected GRC in 90 days?
Implementing Connected GRC in 90 days means launching a focused, usable workflow that connects core GRC records — risks, obligations, policies, controls, evidence, tests, issues, remediation, owners, and dashboards — around a specific business problem.
It does not mean the entire enterprise risk and compliance program is transformed in 90 days.
It means the organization has:
- one clear scope
- one connected data model
- one workflow live
- real users trained
- source records connected
- evidence being collected
- issues being assigned
- dashboards being used
- executives seeing early value
- a roadmap for expansion
A 90-day implementation should be practical.
The first phase should answer:
- What workflow are we improving first?
- Who owns it?
- What records are required?
- What evidence matters?
- What issues need remediation?
- What dashboard will leaders actually use?
- What manual work will be reduced?
- What decisions will become easier?
- What comes next?
That is a strong first phase.
The 90-day rule: start with one connected workflow
Connected GRC is broad.
That does not mean the implementation should be broad.
Start with one of these high-value workflows:
| Starting workflow | Best when the pain is |
|---|---|
| Controls, evidence, and issues | Audit readiness, duplicate evidence requests, SOC 2, SOX, compliance testing |
| Third-party risk and contracts | Vendor onboarding, cyber / privacy reviews, renewals, vendor evidence, open issues |
| ERM dashboards and issues | Executive reporting is manual, risks are stale, issues are not tied to appetite |
| Operational resilience | Critical services, BIAs, assets, vendors, incidents, and continuity plans are disconnected |
| AI governance | AI use is growing faster than review, approval, monitoring, and evidence |
| Regulatory change and policies | Regulatory changes are tracked manually and not linked to controls or evidence |
The best first workflow is not always the most strategic.
It is the one where:
- the pain is obvious
- the data is available
- the owners are known
- the workflow is repeatable
- success can be measured
- leadership cares about the outcome
- adoption can happen quickly
Do not start by implementing every GRC module.
Start by proving that connected work is better than disconnected work.
The 90-day implementation structure
A practical 90-day Connected GRC implementation can be divided into six stages.
| Timeline | Stage | Outcome |
|---|---|---|
| Days 1–10 | Align and scope | Executive sponsor, workflow scope, success metrics |
| Days 11–20 | Design the data model | Core records, owners, relationships, required fields |
| Days 21–35 | Load and clean priority records | Risks, controls, vendors, issues, policies, evidence requirements |
| Days 36–55 | Build the workflow | Intake, evidence, testing, issue remediation, approvals |
| Days 56–75 | Launch the pilot | Real users, real records, real evidence, first dashboard |
| Days 76–90 | Stabilize and scale | Adoption, metrics, lessons, expansion roadmap |
This structure keeps the work grounded.
Each stage creates something useful.
Days 1–10: Align and scope
The first ten days are about alignment.
Do not start with configuration.
Start with the problem.
The team should define:
- executive sponsor
- program owner
- first workflow
- business problem
- users
- records in scope
- records out of scope
- success metrics
- reporting needs
- decision cadence
- implementation team
- escalation path
A good phase-one scope might be:
“Connect SOC 2 and SOX control evidence, testing, issues, remediation, and dashboards for the top 50 shared controls.”
Or:
“Create a connected vendor intake and due diligence workflow for high-risk vendors, including cyber, privacy, contract, evidence, issues, and renewal visibility.”
Or:
“Build an ERM dashboard that connects top risks to KRIs, controls, incidents, open issues, remediation, and decisions needed.”
That is specific.
A weak scope sounds like:
“Implement Connected GRC.”
That is too broad.
Choose a sponsor who can make tradeoffs
Connected GRC touches multiple teams.
That means tradeoffs will happen.
The implementation needs an executive sponsor who can decide:
- which workflow comes first
- which teams must participate
- which records are required
- which legacy process changes
- which dashboards matter
- which requirements can wait
- which exceptions are acceptable
- what “good enough for phase one” means
The sponsor does not need to manage the project every day.
But the sponsor must help prevent scope creep.
Without that, the 90-day plan becomes a six-month planning exercise.
Define success before building
Success should be measurable.
Examples:
Controls, evidence, and issues
- 50 controls loaded
- 100% of controls assigned owners
- evidence requirements defined for each control
- evidence requests sent through workflow
- rejected evidence tracked
- issues created for failed controls
- dashboard live for evidence and issues
Third-party risk
- high-risk vendor intake live
- risk tiering workflow configured
- cyber, privacy, and contract reviews routed
- vendor evidence tracked
- issues assigned owners
- renewals with open issues visible
ERM dashboard
- top risks loaded
- risk owners assigned
- KRIs defined
- issues linked to risks
- incidents linked to risks
- dashboard live for executive review
Operational resilience
- critical services loaded
- owners assigned
- dependencies mapped for pilot services
- BIAs linked
- incidents and issues linked
- readiness dashboard live
Success should not be vague.
It should be visible by Day 90.
Days 11–20: Design the connected data model
The data model is the backbone of Connected GRC.
Do not overdesign it.
Start with the records required for the first workflow.
For a controls, evidence, and issues implementation, the model may include:
- framework requirement
- control
- evidence request
- evidence submission
- test result
- issue
- remediation plan
- validation record
- dashboard
For third-party risk, it may include:
- vendor
- intake request
- risk tier
- assessment
- evidence
- contract
- issue
- incident
- renewal
- offboarding task
For ERM, it may include:
- risk
- risk owner
- KRI
- control
- issue
- incident
- mitigation plan
- risk acceptance
- dashboard
For operational resilience, it may include:
- important service
- process
- BIA
- asset
- vendor
- continuity plan
- incident
- issue
- scenario test
- evidence
The key is relationship design.
Connected GRC is not only about storing records.
It is about linking records so the organization can answer better questions.
Define the minimum viable data model
A minimum viable data model should answer:
- What record types are needed?
- What fields are required?
- Who owns each record?
- Which records link to each other?
- What status values are needed?
- What evidence is required?
- What issue workflow is required?
- What dashboard will use the data?
- What permissions are needed?
- What should be excluded for phase one?
For phase one, avoid unnecessary complexity.
Do not build every possible field.
Build the fields needed to operate and report.
A control record does not need 100 fields on day one.
It may need:
- control ID
- control name
- owner
- frequency
- framework mappings
- evidence requirement
- test status
- issue status
- remediation status
Start there.
Add detail when the workflow proves value.
Keep record relationships simple
The first implementation should focus on the most important relationships.
Examples:
- risk → control
- control → evidence
- evidence → test
- test → issue
- issue → remediation
- remediation → validation
- vendor → contract
- vendor → evidence
- vendor → issue
- incident → root cause
- incident → issue
- service → asset
- service → vendor
- service → continuity plan
Do not try to map every possible relationship in the first 90 days.
The goal is enough connection to reduce friction and improve decisions.
Not perfect ontology.
Days 21–35: Load and clean priority records
Now the team loads priority data.
This is where many implementations slow down because teams try to migrate everything.
Do not migrate everything.
Migrate the records needed for phase one.
If the first workflow is controls and evidence, load:
- priority frameworks
- priority controls
- control owners
- evidence requirements
- current test status
- open issues
- key policies
- dashboard fields
If the first workflow is third-party risk, load:
- priority vendors
- criticality or risk tier
- vendor owners
- contracts or renewal dates
- current assessments
- required evidence
- open vendor issues
- incidents, if relevant
If the first workflow is operational resilience, load:
- critical services
- service owners
- BIAs
- key assets
- key vendors
- continuity plans
- recent incidents
- open resilience issues
The point is to get usable data into the workflow.
Not perfect data.
Usable data.
Clean ownership first
Ownership is one of the most important data elements.
If ownership is wrong, everything else slows down.
The first data cleanup should focus on:
- risk owners
- control owners
- evidence owners
- issue owners
- vendor owners
- service owners
- policy owners
- remediation owners
- dashboard owners
A record without an owner should not be considered ready.
Connected GRC depends on accountability.
If the team cannot assign ownership, that is itself an issue.
Decide what not to load
This is just as important.
For the first 90 days, avoid loading:
- outdated controls
- dormant vendors
- inactive risks
- closed issues with no relevance
- policies not in scope
- old audit artifacts
- low-risk long-tail records
- historical data that will not be used
- fields no one will maintain
Historical data can be valuable later.
But it can also slow phase one.
The first launch should focus on current operating records.
Days 36–55: Build the workflow
Once the data model and priority records are ready, build the workflow.
The workflow should answer:
- how work starts
- who owns each step
- what evidence is required
- what review happens
- what status means
- when issues are created
- how escalation works
- how remediation is validated
- what dashboard shows progress
For a controls and evidence workflow, build:
- evidence request
- evidence submission
- evidence review
- rejection reason
- test result
- issue creation
- remediation plan
- validation
- dashboard
For a third-party risk workflow, build:
- vendor intake
- risk tiering
- assessment routing
- vendor evidence request
- internal review
- issue creation
- approval decision
- renewal review
- dashboard
For an ERM workflow, build:
- risk assessment
- KRI update
- issue linkage
- incident linkage
- mitigation plan
- risk acceptance
- appetite dashboard
- decision-needed workflow
For operational resilience, build:
- service record
- dependency mapping
- BIA linkage
- plan linkage
- incident linkage
- scenario test
- issue remediation
- readiness dashboard
The workflow should feel like how people actually work.
Not how a framework diagram looks.
Build issue management into every workflow
Issue management should be part of the first implementation.
Do not treat it as a future phase.
Every Connected GRC workflow eventually finds gaps.
Examples:
- evidence rejected
- control failed
- vendor review incomplete
- privacy review overdue
- incident root cause unresolved
- resilience dependency missing
- AI use case lacking approval
- policy overdue
- regulatory change not implemented
The issue workflow should include:
- issue source
- owner
- severity
- root cause
- due date
- remediation plan
- evidence required
- validation method
- status
- escalation
If phase one does not include issues, the workflow will collect data but not drive action.
Connected GRC should create remediation.
Not just visibility.
Build evidence standards early
Evidence should be structured from the beginning.
For each evidence request, define:
- what evidence is needed
- which control, vendor, issue, or obligation it supports
- what period it covers
- who provides it
- who reviews it
- what acceptance criteria apply
- what causes rejection
- whether evidence can be reused
- whether it expires
SmartSuite’s Compliance Management page describes centralizing evidence, standardizing compliance workflows, and connecting policies, obligations, controls, assessments, evidence, and remediation in one workflow.
That is the right operating model for phase one.
Do not wait until audit season to define evidence standards.
Days 56–75: Launch the pilot
The pilot should use real records and real users.
Do not run a theoretical pilot with sample data only.
Choose a manageable pilot group.
Examples:
- one compliance framework
- one SOX / SOC 2 control set
- one vendor risk category
- one business unit
- one critical service
- one AI governance workflow
- one regulatory change workflow
- one audit engagement
The pilot should test:
- record ownership
- workflow routing
- evidence collection
- review steps
- issue creation
- remediation tracking
- dashboard accuracy
- user experience
- reporting usefulness
- data quality
- permission model
This is where assumptions become visible.
The pilot will reveal what is too complex, what is missing, and what users do not understand.
That is good.
The point is to fix it before scaling.
Train users on the workflow, not the platform
Training should focus on what people need to do.
Control owners do not need to learn every platform feature.
They need to know:
- where to see assigned controls
- how to submit evidence
- what good evidence looks like
- how to respond to rejection
- how issues are assigned
- what dashboards show
Vendor managers need to know:
- how intake works
- how risk tiering works
- what evidence is required
- how issues affect renewal
- where to see vendor status
Risk owners need to know:
- how risks are updated
- how issues affect residual risk
- how dashboards show appetite
- how decisions are captured
Training should be role-based.
Do not train everyone on everything.
Use pilot feedback to simplify
The most important pilot question is:
What is harder than it needs to be?
Look for:
- too many required fields
- unclear status values
- evidence requests that are too vague
- workflows with too many approvals
- dashboards with too much noise
- owners not understanding their role
- duplicate records
- unclear escalation
- missing instructions
- permissions blocking work
- data fields no one uses
Simplify aggressively.
A 90-day implementation succeeds when users adopt the workflow.
Not when the design is theoretically complete.
Days 76–90: Stabilize and scale
The final 15 days are about stabilizing the first workflow and preparing the next phase.
By Day 90, the team should have:
- live workflow
- trained users
- current records
- dashboards in use
- issue workflow running
- evidence trail established
- early success metrics
- lessons learned
- expansion backlog
- phase-two roadmap
The team should conduct a Day 90 review.
Ask:
- What worked?
- What slowed us down?
- Which users adopted quickly?
- Which data fields were missing?
- Which dashboards were useful?
- Which reports were ignored?
- Which workflow steps need simplification?
- Which pain point improved?
- Which phase-two workflow is next?
The Day 90 review should not be a project closure meeting.
It should be a scale decision.
What should be live by Day 90?
A good 90-day Connected GRC launch should have:
- one live workflow
- one connected data model
- priority records loaded
- ownership assigned
- evidence requests working
- issue workflow working
- remediation tracking working
- dashboard live
- users trained
- success metrics tracked
- phase-two roadmap defined
For example, if the first workflow is controls, evidence, and issues, Day 90 should show:
- priority controls loaded
- evidence requirements defined
- evidence submitted
- evidence reviewed
- rejected evidence tracked
- test results recorded
- issues created
- remediation owners assigned
- dashboards used in management review
That is real value.
Even if the full enterprise program is not done.
What should not be required by Day 90?
A 90-day launch should not require:
- all risks loaded
- all controls migrated
- all vendors onboarded
- all policies mapped
- all audits integrated
- all dashboards finalized
- all historical issues migrated
- all integrations completed
- every business unit included
- every framework mapped
- every taxonomy perfected
Trying to do all of that will slow the first launch.
Phase one should be narrow enough to succeed and meaningful enough to matter.
The best phase-one starting points
Starting point 1: Controls, evidence, and issues
This is often the best first workflow.
Why it works:
- evidence pain is visible
- control owners feel the friction
- audit readiness improves quickly
- dashboards are useful
- issue remediation becomes more accountable
Good for:
- SOC 2
- SOX
- compliance testing
- internal audit
- control libraries
- evidence management
Starting point 2: Third-party risk
Good when vendor onboarding or renewal risk is fragmented.
Why it works:
- intake creates structure
- risk tiering routes work
- vendor evidence becomes visible
- issues affect approval and renewal
- business owners see value
Good for:
- procurement
- vendor managers
- cyber review
- privacy review
- resilience
- contracts
Starting point 3: ERM and issue dashboards
Good when executives lack risk visibility.
Why it works:
- top risks are limited in number
- issues can be linked quickly
- dashboards create executive value
- risk appetite can become actionable
Good for:
- CRO
- board
- executive risk committee
- enterprise risk team
Starting point 4: Operational resilience
Good when critical services, BIAs, vendors, and incidents are disconnected.
Why it works:
- service maps create clarity
- dependencies become visible
- incidents and issues connect to readiness
- dashboards show executive decisions
Good for:
- resilience leaders
- business continuity
- operations
- technology
- third-party risk
Starting point 5: AI governance
Good when AI adoption is moving quickly.
Why it works:
- inventory creates immediate visibility
- intake routes privacy, cyber, legal, and vendor review
- issue management prevents approval gaps
- dashboards help leaders see AI posture
Good for:
- AI governance
- legal
- privacy
- cyber
- third-party risk
- compliance
The implementation team
A 90-day implementation does not need a huge team.
It needs the right team.
Core roles:
| Role | Responsibility |
|---|---|
| Executive sponsor | Makes tradeoffs and removes blockers |
| Program owner | Owns scope, timeline, decisions, and adoption |
| Workflow owner | Owns the phase-one workflow design |
| Data model lead | Defines records, fields, relationships, and ownership |
| GRC subject-matter leads | Provide requirements from risk, compliance, audit, cyber, privacy, etc. |
| Platform/configuration lead | Builds workflow, permissions, dashboards, and automations |
| Reporting lead | Defines dashboards and decision views |
| Change/adoption lead | Manages training, communications, and user feedback |
| Business representatives | Validate usability and ownership |
Keep the group small enough to move.
Bring in additional stakeholders for focused review.
Do not turn every design meeting into a steering committee.
Governance for the implementation
The implementation needs simple governance.
Use three meeting types.
Weekly working session
Focus:
- workflow build
- data issues
- user feedback
- blockers
- decisions needed
Biweekly sponsor check-in
Focus:
- scope
- risks
- tradeoffs
- adoption
- executive decisions
Day 30 / 60 / 90 reviews
Focus:
- progress against outcomes
- data readiness
- workflow adoption
- dashboard usefulness
- scale readiness
Keep governance lightweight.
Connected GRC implementation should not become a governance burden before it solves one.
Avoid the taxonomy trap
Taxonomy matters.
But taxonomy can also delay implementation.
Teams may debate:
- risk categories
- control types
- issue severity labels
- evidence types
- vendor risk tiers
- asset criticality
- policy classifications
- audit finding categories
- incident severity
- service criticality
These are important.
But do not let taxonomy debates prevent the first workflow from going live.
Use a practical phase-one taxonomy.
Then refine as the program scales.
A good rule:
If a taxonomy decision does not affect the phase-one workflow or dashboard, defer it.
This keeps the implementation moving.
Avoid the integration trap
Integrations are valuable.
But waiting for every integration can delay value.
In phase one, decide which integrations are essential and which can wait.
Essential integrations may include:
- identity / user directory
- evidence source
- ticketing system
- vendor system
- asset inventory
- audit or compliance tool
- document repository
But many 90-day implementations can start with:
- loaded priority records
- controlled imports
- workflow-based data entry
- evidence upload
- dashboard reporting
Do not let perfect integration block useful workflow.
Build the model.
Prove value.
Then integrate where it reduces real friction.
Avoid the dashboard trap
Dashboards are important.
But dashboards are only as good as the records underneath them.
Do not start by designing 20 dashboards.
Start with 3 to 5 views that support decisions.
For a controls and evidence pilot:
- evidence due / overdue
- evidence rejected
- controls without accepted evidence
- issues by owner
- decisions needed
For a vendor risk pilot:
- vendors by risk tier
- assessments overdue
- vendor evidence missing
- open vendor issues
- renewals with unresolved risk
For an ERM pilot:
- top risks
- risks outside appetite
- KRIs above threshold
- open issues by risk
- executive decisions needed
A dashboard should answer:
What needs attention?
If it does not, remove it.
Common mistakes to avoid
Mistake 1: Starting with every GRC domain
Start with one high-value workflow.
Expand after proving the connected model.
Mistake 2: Treating implementation as a data migration project
Data matters, but workflow value matters more.
Load the records needed for the first use case.
Mistake 3: Overbuilding the data model
Start with required fields and important relationships.
Do not model every possible scenario on day one.
Mistake 4: Ignoring ownership
Connected GRC fails when records lack owners.
Clean ownership early.
Mistake 5: Designing dashboards before source records are usable
Dashboards should reflect connected records.
Do not build pretty reports on weak data.
Mistake 6: Training everyone on everything
Train people by role and workflow.
Control owners, vendor managers, risk owners, and executives need different training.
Mistake 7: Waiting for perfection
A useful phase-one workflow beats a perfect design that never launches.
A practical 90-day checklist
By the end of the first 90 days, the program should be able to answer:
- Which workflow went live?
- Who owns it?
- Which records are connected?
- Which users are trained?
- Which evidence is being collected?
- Which issues are being remediated?
- Which dashboards are being used?
- What manual work was reduced?
- What risks are more visible?
- What decisions are easier?
- What data quality issues remain?
- What should phase two include?
- What success metrics improved?
If the team cannot answer those questions, the implementation may have become too broad or too technical.
If it can, the connected model is working.
A practical example: 90-day controls and evidence implementation
Days 1–10
- select SOC 2 / SOX shared controls as first scope
- assign executive sponsor
- define 50 priority controls
- define success metrics
Days 11–20
- design control, evidence, testing, issue, remediation, and dashboard records
- define control owner and evidence owner roles
- define status values
Days 21–35
- load controls
- map frameworks
- assign owners
- define evidence requirements
- load open issues
Days 36–55
- build evidence request workflow
- build evidence review workflow
- build issue workflow
- build remediation validation workflow
- build dashboard
Days 56–75
- pilot with control owners
- collect evidence
- track rejected evidence
- create issues
- review dashboard
Days 76–90
- refine workflow
- train broader pilot group
- publish success metrics
- confirm phase-two expansion
By Day 90, the team has a working control-evidence-issue model.
That can then expand into more frameworks, audits, policies, regulatory inquiries, and dashboards.
A practical example: 90-day third-party risk implementation
Days 1–10
- select high-risk vendor onboarding as first scope
- define intake triggers
- assign vendor risk owners
- define success metrics
Days 11–20
- design vendor, intake, risk tier, assessment, evidence, contract, issue, and renewal records
Days 21–35
- load priority vendors
- assign owners
- load contracts and renewal dates
- load open issues
Days 36–55
- build intake and risk tiering workflow
- build cyber, privacy, and contract review routing
- build vendor evidence workflow
- build issue workflow
Days 56–75
- run pilot vendors through intake
- collect evidence
- assign issues
- test approval workflow
Days 76–90
- refine routing
- train procurement and business owners
- launch vendor dashboard
- define phase-two renewal workflow
By Day 90, vendor onboarding becomes connected to risk, evidence, contracts, issues, and approvals.
That is real progress.
A practical example: 90-day ERM dashboard implementation
Days 1–10
- select top enterprise risks as scope
- define executive audience
- define appetite and reporting needs
Days 11–20
- design risk, KRI, issue, incident, control, and dashboard records
Days 21–35
- load top risks
- assign owners
- load KRIs
- link open issues
- link major incidents
Days 36–55
- build risk update workflow
- build issue linkage
- build KRI threshold workflow
- build risk dashboard
Days 56–75
- pilot dashboard with risk owners
- validate risk movement
- refine thresholds
- confirm decisions-needed view
Days 76–90
- present executive dashboard
- capture decisions
- refine cadence
- define next domain to connect
By Day 90, ERM reporting becomes more connected to issues, incidents, controls, and decisions.
That creates leadership value quickly.
How to know when you are ready to scale
Scale when the first workflow has:
- clear owners
- stable workflow
- users trained
- dashboard adopted
- issue management working
- evidence standards defined
- measurable improvement
- sponsor support
- phase-two scope defined
Do not scale just because the calendar says Day 90.
Scale because the first workflow is working.
Possible phase-two expansions include:
- controls to policies
- evidence to regulatory inquiries
- issues to ERM
- vendors to contracts and renewals
- incidents to resilience
- resilience to critical services
- AI intake to vendor and privacy reviews
- internal audit to evidence and issues
- dashboards to board reporting
Connected GRC should expand along relationships.
Not random modules.
Final thought
Connected GRC does not need to start as a massive transformation.
It should start as a focused implementation that proves the value of connected work.
In 90 days, the organization can choose one painful workflow, define the right records, assign ownership, connect evidence, route issues, build dashboards, train users, and show early value.
That is enough.
Enough to reduce duplicate work.
Enough to improve evidence readiness.
Enough to make issue ownership clearer.
Enough to give leaders a better dashboard.
Enough to prove that connected workflows are better than disconnected trackers.
Then the program can scale.
The organizations that succeed with Connected GRC do not boil the ocean.
They connect one meaningful workflow, prove value, and expand from there.
That is how to implement Connected GRC in 90 days.
SmartSuite delivers a centralized governance framework for managing AI models throughout their lifecycle across the enterprise. Maintain structured visibility into AI model inventories, perform tier-based risk and performance assessments, and connect directly to governing controls, laws, and frameworks to demonstrate accountable and compliant AI use across the enterprise — all within a single, connected platform.
Streamline your compliance operations with a connected platform built for speed, accuracy, and continuous oversight. SmartSuite centralizes frameworks, controls, evidence, testing, and policies — helping compliance teams eliminate manual work, improve collaboration, and stay always audit-ready.
Protect your organization with a connected cybersecurity platform that unifies asset protection, threat detection, incident response, and compliance. SmartSuite empowers security teams to manage risks, streamline workflows, and maintain resilience against evolving threats.
Strengthen your risk program with a unified platform that connects risk identification, assessment, mitigation, monitoring, and reporting. SmartSuite centralizes your entire risk lifecycle — helping teams reduce complexity, eliminate silos, and make confident, data-driven decisions.
Build a sustainable future with a platform that connects environmental, social, and governance data in one place. SmartSuite simplifies ESG reporting, compliance tracking, and performance measurement — helping organizations operate responsibly and meet evolving stakeholder expectations.
Manage the full audit lifecycle—planning, testing, and reporting—in one connected system.
SmartSuite connects Business Impact Analysis, important business services, continuity plans, crisis response, and physical security operations into one unified resilience framework. Track incidents, run exercises, coordinate corrective actions, and safeguard people, facilities, and operations — all from a single, integrated platform.
SmartSuite empowers privacy teams to operationalize compliance with GDPR, CCPA, HIPAA, FERPA, and emerging global regulations. Map data flows, run DPIAs/PIAs, manage DSARs, track incidents, and maintain evidence — all connected to the risks, controls, and workflows that shape your privacy program.
SmartSuite helps organizations manage SOX compliance with confidence by connecting risks, controls, testing, evidence, and remediation in one unified platform. Replace spreadsheets and disconnected tools with structured workflows, real-time visibility, and audit-ready execution across the entire SOX lifecycle.
Standardize vendor due diligence, centralize assessments, and monitor ongoing risk exposure to ensure supplier reliability and compliance.
Linked Articles
Connected GRC links risk, compliance, audit, cyber, third-party risk, privacy, AI governance, ESG, SOX, and resilience into shared workflows, data, and accountability.
Learn what Connected GRC means and how it connects risk, compliance, audit, evidence, issues, resilience, dashboards, and decisions.
Learn the difference between a modern GRC platform and a legacy GRC program, including how connected workflows improve risk, controls, evidence, issues, audit, and reporting.
Learn the difference between modern GRC and legacy GRC, and why connected workflows, evidence, issues, vendors, AI, cyber, dashboards, and decisions matter.
Learn how a Connected GRC operating model links risks, controls, obligations, policies, issues, audits, vendors, incidents, evidence, and reporting into one practical system.
Learn the core records every Connected GRC program needs, including risks, obligations, controls, evidence, issues, vendors, incidents, assets, audits, and dashboards.
Learn how to build a Connected GRC business case by quantifying duplicate work, audit effort, evidence gaps, issue remediation, vendor risk, reporting friction, and executive value.
Learn where to start with Connected GRC, the right implementation sequence, and why data model, owners, intake, issues, evidence, risk acceptance, and dashboards must happen in order.
Learn how to build a Connected GRC intake process that routes risks, controls, vendors, AI, privacy, cyber, evidence, issues, exceptions, and regulatory changes to the right owners.
Learn how to build GRC workflows business owners will actually use by making intake, evidence, issues, vendors, AI, exceptions, and approvals clear, risk-based, and connected.
Learn how evidence management works in Connected GRC by linking evidence to controls, obligations, tests, audits, issues, remediation, owners, periods, and approvals.
Learn how issue remediation and validation work in Connected GRC by linking findings, root cause, owners, remediation plans, evidence, retesting, validation, and risk reduction.
Learn how to build a GRC exception management process that governs policy, control, evidence, vendor, cyber, AI, privacy, and risk exceptions with owners, evidence, approvals, and dashboards.
Frequently Asked Questions
Answers to common questions about SmartSuite’s pricing models, plan options, and onboarding programs.
A full enterprise-wide Connected GRC transformation usually takes longer than 90 days. But a focused Connected GRC workflow can be implemented in 90 days if the scope is clear, records are prioritized, owners are assigned, and the team avoids overbuilding.
A 90-day implementation should include a focused workflow, connected data model, priority records, assigned owners, evidence workflow, issue remediation workflow, dashboards, trained users, success metrics, and a phase-two roadmap.
Start where the pain is clear and value can be proven quickly. Common starting points include controls and evidence, issue remediation, third-party risk, ERM dashboards, operational resilience, regulatory change, or AI governance.
The biggest mistake is trying to implement every GRC domain at once. A better approach is to start with one high-value workflow, prove the connected model, and expand from there.
Core Connected GRC records often include risks, obligations, policies, controls, evidence, tests, issues, remediation plans, incidents, vendors, assets, audits, regulatory inquiries, services, dashboards, and decisions.
Avoid boiling the ocean by limiting phase-one scope, using a minimum viable data model, loading only priority records, assigning ownership early, building one workflow, launching a real pilot, and measuring success before scaling.
Build dashboards that support the first workflow. For controls and evidence, start with evidence due, rejected evidence, controls without evidence, open issues, and decisions needed. For vendors, start with risk tiers, overdue reviews, missing evidence, open issues, and renewals with unresolved risk.
Scale by expanding along connected workflows. For example, connect controls to policies, evidence to audits, issues to ERM, vendors to contracts, incidents to resilience, or AI intake to privacy and cyber reviews.