Connected GRC Implementation Checklist: First 90 Days

Use this Connected GRC implementation checklist to launch your first 90 days with owners, records, workflows, evidence, issues, dashboards, and measurable outcomes.
Category
Checklist & Toolkits
Stage
Improve
Product Group
GRC & Resilience

Connected GRC does not need to start as a massive transformation.

It should start with one useful workflow.

One real business problem.
One set of source records.
One group of accountable owners.
One dashboard that leaders can trust.
One operating rhythm that turns GRC work into decisions.

That is how Connected GRC becomes real.

Not through a long roadmap that promises enterprise-wide transformation in two years.
Not through a platform implementation that copies old spreadsheets into new tables.
Not through a maturity model that identifies every possible gap but fixes none of them.
Not through workshops where every function describes its ideal future state.

The first 90 days should prove that Connected GRC can improve the way the organization works.

A good 90-day implementation should show:

  • risks linked to controls
  • controls linked to evidence
  • evidence linked to review status
  • failed evidence linked to issues
  • issues linked to remediation
  • remediation linked to validation
  • vendors linked to contracts or risks, where relevant
  • dashboards linked to source records
  • decisions linked to accountable owners
  • old spreadsheets frozen or retired where possible

The goal is not to boil the ocean.

The goal is to prove the operating model.

This checklist gives GRC leaders a practical way to do that.

What is a Connected GRC implementation?

A Connected GRC implementation is the process of launching governed, linked workflows across risks, controls, evidence, issues, vendors, incidents, policies, obligations, audits, dashboards, and decisions so risk and compliance work becomes traceable, accountable, and decision-ready.

A Connected GRC implementation should answer:

  • What problem are we solving first?
  • Which workflow will launch first?
  • Which records are required?
  • Who owns each record?
  • What statuses will drive workflow?
  • Which evidence is needed?
  • What issue workflow is triggered when something fails?
  • Which dashboard will show readiness?
  • Which decisions will improve?
  • Which legacy tracker will be retired?
  • What value will be visible in 90 days?

OCEG’s definition of GRC matters here because Connected GRC should not be treated as a tool rollout only. It should support the organization’s ability to achieve objectives, address uncertainty, and act with integrity.

That means the first 90 days should improve operating confidence.

Not only system configuration.

What should the first 90 days accomplish?

The first 90 days should accomplish five things.

  1. Prove one connected workflow works.
  2. Create a reusable data model.
  3. Assign owners and decision rights.
  4. Launch a dashboard built from source records.
  5. Show measurable improvement.

A weak first 90 days says:

“We configured the platform and migrated data.”

A strong first 90 days says:

“We launched the evidence and issue workflow for key controls. Control owners now submit evidence through a governed process. Evidence is reviewed as accepted or rejected. Rejected evidence creates issues when needed. Issues require remediation and validation. The dashboard shows readiness by owner, control, framework, and decision needed. The old evidence tracker is frozen.”

That is implementation progress.

Not just configuration progress.

The first implementation rule: start with one workflow

The biggest mistake is starting too broadly.

Connected GRC can eventually include:

  • ERM
  • compliance
  • internal audit
  • SOX
  • SOC 2
  • third-party risk
  • cyber risk
  • operational resilience
  • privacy
  • AI governance
  • ESG
  • regulatory change
  • policy management
  • evidence management
  • issue management
  • dashboards
  • board reporting

But the first 90 days should not implement everything.

Choose one workflow where value is visible.

Good first workflows include:

First workflowBest when
Controls, evidence, and issuesAudit readiness, SOX, SOC 2, or duplicate evidence requests are painful
Issue remediation and validationIssues close without proof or repeat findings are common
Third-party risk and renewalsVendor risk is disconnected from contracts, evidence, and renewal decisions
Executive risk dashboardLeaders lack a reliable view of risk appetite, issues, and decisions
Cyber risk to business impactCyber reporting is too technical and not tied to assets, services, vendors, or risk appetite
AI governance intakeAI use is growing faster than governance
Operational resilience mappingCritical services, assets, vendors, and recovery plans are disconnected
Regulatory inquiry evidenceRegulatory or customer responses require fire drills

Do not choose the easiest workflow.

Choose the one where the business will notice improvement.

The 90-Day Connected GRC Implementation Checklist

Phase 1: Days 1–15 — Define the outcome and scope

The first 15 days should create clarity.

Do not start by configuring fields.

Start by defining the outcome.

Checklist: Define the implementation outcome

QuestionYes / No
Have we defined the business problem we are solving?
Have we selected one primary workflow for the first 90 days?
Have we defined what will be different after launch?
Have we named an executive sponsor?
Have we named a workflow owner?
Have we named a GRC program owner?
Have we identified the core stakeholder group?
Have we defined success metrics?
Have we identified the legacy tracker or process this will replace?
Have we agreed on what is out of scope for the first 90 days?

A clear implementation outcome might be:

“By Day 90, key controls for SOC 2 and SOX overlap will have owners, evidence requirements, evidence request workflows, evidence review status, issue creation for failures, remediation tracking, validation status, and a dashboard showing readiness and decisions needed.”

That is specific.

It is also achievable.

Phase 1 deliverables

By Day 15, you should have:

  • implementation scope
  • executive sponsor
  • workflow owner
  • stakeholder list
  • first workflow selected
  • success metrics
  • legacy tracker identified
  • decision rights draft
  • dashboard concept
  • 90-day implementation plan

If those are unclear, implementation will drift.

Phase 2: Days 16–30 — Build the minimum viable data model

Connected GRC depends on connected records.

The first data model should be practical.

Do not design every possible record type.

Design the records needed for the first workflow.

Checklist: Define source records

RecordNeeded?Owner assigned?Required fields defined?
Risk
Obligation
Policy
Control
Evidence request
Evidence submission
Test result
Issue
Remediation plan
Validation record
Vendor
Contract
Incident
Dashboard
Decision

For a controls, evidence, and issues workflow, the minimum model may include:

  • controls
  • evidence requests
  • evidence submissions
  • evidence review status
  • test results
  • issues
  • remediation plans
  • validation records
  • dashboards

For a vendor workflow, add:

  • vendor
  • contract
  • risk tier
  • business owner
  • assessment
  • evidence
  • renewal
  • vendor issue

For an AI governance workflow, add:

  • AI use case
  • AI system
  • data used
  • vendor
  • risk tier
  • approval
  • monitoring
  • AI issue

The model should be as small as possible while still supporting the workflow.

Checklist: Define required fields

Every key record should have:

FieldPurpose
NameIdentifies the record
DescriptionExplains what it is
OwnerCreates accountability
StatusDrives workflow
SourceShows where it came from
Related recordsCreates traceability
Due date or review dateSupports workflow timing
Evidence, where relevantSupports proof
Severity or criticality, where relevantSupports prioritization
Last updated dateSupports data quality

For the first workflow, also define:

  • status values
  • required relationships
  • approval rules
  • escalation triggers
  • issue triggers
  • dashboard fields

Do not let every team invent its own statuses.

That recreates silos.

Phase 2 deliverables

By Day 30, you should have:

  • minimum viable data model
  • required fields
  • owner fields
  • status values
  • relationship map
  • source-record list
  • data-quality standard
  • dashboard data sources
  • draft workflow design

This is the backbone of Connected GRC.

Phase 3: Days 31–45 — Clean and migrate priority records

Do not migrate everything.

Migrate what the first workflow needs.

That means current, active, useful records.

Checklist: Clean priority records

Data cleanup questionYes / No
Have we removed obsolete records from the migration scope?
Have we identified duplicate controls, issues, vendors, or policies?
Have we normalized names?
Have we assigned current owners?
Have we cleaned statuses?
Have we identified missing required fields?
Have we linked related records?
Have we flagged records that need owner review?
Have we archived historical records that should not be active?
Have we documented migration assumptions?

For controls, migrate:

  • key controls
  • current owners
  • framework mappings
  • evidence requirements
  • test procedures
  • open issues

For evidence, migrate:

  • current evidence requirements
  • active evidence requests
  • accepted evidence, where relevant
  • rejected or missing evidence that needs action

For issues, migrate:

  • open issues
  • high-severity issues
  • overdue issues
  • repeat issues
  • issues pending validation

For vendors, migrate:

  • critical vendors
  • high-risk vendors
  • vendors with open issues
  • vendors near renewal
  • vendors with sensitive data or system access

The first implementation should improve signal.

Not preserve clutter.

Checklist: Ownership cleanup

Ownership questionYes / No
Does every migrated risk have an owner?
Does every migrated control have an owner?
Does every evidence request have a provider and reviewer?
Does every open issue have an owner?
Does every remediation action have an owner?
Does every validation step have an owner?
Does every critical vendor have a business owner?
Does every dashboard have an owner?
Are owner changes reviewed?
Are role-based owners defined where people may change?

The IIA’s Three Lines Model is useful here because it reinforces clear roles across management and internal audit, while preserving internal audit’s independent assurance role.

A Connected GRC implementation should clarify accountability.

Not shift every responsibility to the GRC team.

Phase 3 deliverables

By Day 45, you should have:

  • priority records migrated
  • owners assigned
  • duplicate records flagged
  • statuses cleaned
  • relationship mapping started
  • missing-field report
  • data-quality issues assigned
  • legacy tracker retirement plan drafted

Do not wait for perfect data.

But do not launch with obviously broken ownership and statuses.

Phase 4: Days 46–60 — Build the workflow

Now build the actual operating workflow.

The workflow should define:

  • how work starts
  • who receives it
  • what evidence is required
  • who reviews it
  • what status changes mean
  • when issues are created
  • when escalation happens
  • how remediation works
  • how validation works
  • which dashboard updates

Checklist: Workflow design

Workflow questionYes / No
Is the trigger for the workflow defined?
Is the first step clear?
Is the owner for each step defined?
Are required fields enforced?
Are status values defined?
Are evidence requirements visible?
Are review and approval steps defined?
Are rejection reasons captured?
Are issue triggers defined?
Is remediation workflow defined?
Is validation workflow defined?
Are escalation rules defined?
Are dashboard updates automatic or clearly governed?
Are notifications useful and not excessive?
Is the workflow simple enough for owners to follow?

For evidence management, the workflow might be:

  1. Evidence request created.
  2. Evidence owner notified.
  3. Evidence submitted.
  4. Reviewer accepts or rejects.
  5. Rejection reason documented.
  6. Material gap creates issue.
  7. Issue owner remediates.
  8. Evidence submitted for remediation.
  9. Validator confirms fix.
  10. Dashboard updates.

For issue remediation, the workflow might be:

  1. Issue opened.
  2. Severity assigned.
  3. Owner assigned.
  4. Root cause documented.
  5. Remediation plan approved.
  6. Remediation evidence submitted.
  7. Validation performed.
  8. Closure approved.
  9. Dashboard updates.
  10. Repeat issue analysis performed.

The workflow should be practical.

A complex workflow that no one uses is not Connected GRC.

It is workflow theater.

Checklist: Issue and validation rules

Issue workflow questionYes / No
Are issue sources defined?
Are severity levels defined?
Is root cause required?
Is remediation evidence required?
Is validation required for high-severity issues?
Is risk acceptance available where remediation is not immediate?
Are repeat issues flagged?
Are overdue issues escalated?
Are issue statuses clear?
Is closure authority defined?

This is where many implementations become valuable quickly.

Executives trust issue reporting more when closure requires evidence and validation.

Phase 4 deliverables

By Day 60, you should have:

  • workflow configured
  • status logic defined
  • issue triggers defined
  • evidence review logic defined
  • remediation workflow defined
  • validation workflow defined
  • escalation rules defined
  • notifications tested
  • pilot users identified
  • training draft created

This is where the implementation starts becoming operational.

Phase 5: Days 61–75 — Launch the pilot and dashboard

Now launch a pilot.

The pilot should include enough records to prove the workflow.

Do not pilot with only perfect examples.

Use real records.

Checklist: Pilot launch

Pilot questionYes / No
Are pilot records selected?
Are pilot owners trained?
Are evidence requirements clear?
Are issue triggers understood?
Is the dashboard live?
Can users see their assigned work?
Can reviewers accept or reject evidence?
Can issues be created from failures?
Can remediation evidence be submitted?
Can validation be completed?
Are escalation rules working?
Is feedback being collected?
Are dashboard metrics accurate?
Are data-quality gaps visible?
Is the old workflow frozen for pilot scope?

The pilot should produce visible outputs:

  • accepted evidence
  • rejected evidence
  • issues created
  • remediation assigned
  • validation completed
  • dashboard updated
  • decisions needed

If the pilot produces only configuration feedback, it is not operational enough.

Checklist: Dashboard readiness

Dashboard questionYes / No
Does the dashboard use source records?
Can users drill into records?
Does it show owners?
Does it show overdue items?
Does it distinguish submitted from accepted evidence?
Does it distinguish remediation complete from validation passed?
Does it show high-severity issues?
Does it show data-quality gaps?
Does it show decisions needed?
Is there a dashboard owner?
Is the refresh cadence defined?
Is the audience defined?

A dashboard should not only show activity.

It should show readiness and decisions.

Phase 5 deliverables

By Day 75, you should have:

  • pilot workflow live
  • trained pilot users
  • dashboard live
  • accepted and rejected evidence visible
  • issue creation tested
  • remediation and validation tested
  • data-quality issues logged
  • user feedback captured
  • legacy workflow freeze started

This phase proves whether the design works in real life.

Phase 6: Days 76–90 — Stabilize, measure, and scale

The last 15 days should focus on stabilization and value reporting.

Do not rush into the next workflow before proving the first one.

Checklist: Stabilization

Stabilization questionYes / No
Are pilot records updated and current?
Are owners using the workflow?
Are evidence reviews working?
Are rejected evidence reasons clear?
Are issues being created properly?
Are remediation plans complete?
Are validation steps working?
Are dashboards trusted?
Are data-quality issues assigned?
Is user feedback reviewed?
Are workflow changes documented?
Is the old tracker retired, frozen, or archived?
Are success metrics measured?
Are executive results prepared?
Is the next workflow selected?

The goal by Day 90 is not perfection.

The goal is proof.

Checklist: Measure value

MetricBaselineDay 90 result
Duplicate evidence requests
Evidence accepted on first submission
Evidence rejected
Evidence overdue
Issues created from failed evidence or controls
High-severity issues overdue
Issues closed with validation
Manual reporting hours
Records missing owners
Legacy trackers retired or frozen
Dashboard users
Decisions made from dashboard

The strongest 90-day implementation reports measurable change.

Even small improvement matters if it proves the model.

Example:

“In 90 days, we launched the key-control evidence workflow for 48 controls. Evidence acceptance improved from 72% to 86%. Duplicate evidence requests were reduced by 22%. Nine evidence gaps created issues. Three issues were remediated and validated. The old evidence tracker is now frozen for the pilot scope. The dashboard is used in the monthly GRC review.”

That is real progress.

Phase 6 deliverables

By Day 90, you should have:

  • working connected workflow
  • live dashboard
  • success metrics
  • data-quality improvement list
  • owner adoption report
  • old tracker retirement status
  • lessons learned
  • executive readout
  • next workflow recommendation
  • updated roadmap

This completes the first Connected GRC implementation cycle.

The 90-Day Checklist Summary

Use this summary table to manage implementation.

PhaseDaysPrimary GoalKey Deliverables
Phase 11–15Define outcome and scopesponsor, workflow, success metrics, stakeholder list
Phase 216–30Build data modelrecords, fields, statuses, relationships, dashboard sources
Phase 331–45Clean and migrate recordsowners, priority records, duplicates, missing fields
Phase 446–60Build workflowevidence review, issue triggers, remediation, validation, escalation
Phase 561–75Launch pilot and dashboardpilot users, live workflow, dashboard, feedback
Phase 676–90Stabilize and measuremetrics, old tracker retirement, executive readout, next workflow

This is a practical pace for proving value without trying to implement every GRC domain at once.

What not to do in the first 90 days

Avoid these mistakes.

Do not migrate every record

Migrate current, active, useful records.

Archive or exclude stale records unless needed.

Do not configure before defining ownership

A workflow without owners will fail.

Do not copy spreadsheet logic into the new model

Connected GRC should improve the operating model, not recreate old clutter.

Do not build dashboards before source records are reliable

Dashboards built on weak data create false confidence.

Do not automate weak workflows

Automation makes broken workflows fail faster.

Do not allow old trackers to remain active indefinitely

Two systems of record will undermine adoption.

Do not make the GRC team the owner of everything

Business owners, control owners, vendor owners, issue owners, and risk owners must own their records.

Do not skip validation

Issue closure without validation weakens trust.

Do not expand before proving value

Finish one workflow well before scaling broadly.

Recommended first workflow by pain point

Use this table to choose where to begin.

Pain pointStart here
Duplicate evidence requestsControls, evidence, and common control workflow
Audit fire drillsEvidence management and audit request workflow
Issues close without proofIssue remediation and validation workflow
Vendor renewals with unresolved riskThird-party risk and renewal workflow
Executives distrust dashboardsData quality and executive scorecard workflow
Cyber risk is too technicalCyber risk to business impact workflow
AI use is spreading quicklyAI use-case intake and inventory workflow
Critical services are unclearOperational resilience service mapping workflow
Regulatory inquiries are chaoticRegulatory inquiry evidence workflow
SOX testing is painfulSOX controls, evidence, and deficiency workflow

The best starting point is the pain point that creates the most visible friction or risk.

The 90-day operating committee agenda

Use the Connected GRC Operating Committee to keep the implementation on track.

Day 15 review

  • confirm scope
  • confirm executive sponsor
  • confirm first workflow
  • approve success metrics
  • approve roadmap

Day 30 review

  • review data model
  • review ownership
  • approve status values
  • identify data-quality risks

Day 45 review

  • review migrated records
  • review duplicate records
  • review missing owners
  • approve pilot scope

Day 60 review

  • review workflow design
  • approve issue and validation rules
  • approve dashboard design
  • confirm pilot users

Day 75 review

  • review pilot results
  • review evidence and issue workflow
  • resolve blockers
  • approve old tracker freeze

Day 90 review

  • review success metrics
  • approve next workflow
  • review lessons learned
  • confirm executive reporting

This rhythm turns implementation into governance.

Not a side project.

The first 90 days by role

Executive sponsor

Owns:

  • business priority
  • escalation
  • funding support
  • executive communication
  • decision authority

GRC program owner

Owns:

  • implementation coordination
  • data model
  • workflow design
  • dashboard coordination
  • roadmap update

Workflow owner

Owns:

  • process design
  • owner adoption
  • workflow quality
  • business rules
  • success metrics

Record owners

Own:

  • accuracy of assigned risks, controls, evidence, issues, vendors, or other records

Data steward

Owns:

  • data-quality checks
  • missing fields
  • duplicates
  • stale records
  • dashboard source quality

Internal audit

Provides:

  • assurance input
  • control and evidence feedback
  • finding and validation insight

Internal audit should not own management’s remediation, but it can provide valuable assurance input during implementation.

Business owners

Own:

  • risk context
  • control performance
  • evidence submission
  • remediation execution
  • workflow adoption

Implementation succeeds when business owners use the workflow.

Not when only the GRC team uses it.

A practical first 90-day checklist

Use this checklist at the start of implementation.

QuestionYes / No
Have we selected one first workflow?
Have we defined the business outcome?
Have we named an executive sponsor?
Have we named a workflow owner?
Have we named the GRC program owner?
Have we defined required records?
Have we defined owners, statuses, and relationships?
Have we identified source records?
Have we cleaned priority records?
Have we migrated only useful records?
Have we defined evidence requirements?
Have we defined issue triggers?
Have we defined remediation and validation?
Have we designed the dashboard from source records?
Have we piloted with real users?
Have we measured baseline and Day 90 results?
Have we frozen or retired at least one legacy tracker?
Have we prepared the executive readout?
Have we selected the next workflow?

If several answers are no, the 90-day implementation may not be focused enough.

How to know the implementation is working

The implementation is working when:

  • owners use the workflow
  • evidence is submitted through the system
  • reviewers accept or reject evidence with reasons
  • issues are created from real failures
  • remediation plans are tracked
  • validation status is visible
  • dashboards reflect source records
  • leaders use dashboards in meetings
  • decisions are recorded
  • old trackers are frozen or retired
  • duplicate requests decrease
  • reporting takes less manual effort
  • users understand what changed

The implementation is not working if:

  • work still happens in spreadsheets
  • dashboards are manually updated
  • owners do not know where to work
  • evidence requirements are unclear
  • issues close without validation
  • old and new workflows run in parallel indefinitely
  • executives see reports but no decisions
  • the GRC team owns every record
  • no measurable improvement appears by Day 90

The test is not whether the system launched.

The test is whether work improved.

A practical Day 90 executive readout

Use this structure for the Day 90 executive update.

1. What we implemented

Describe the workflow launched.

Example:

We implemented a connected evidence and issue workflow for 48 key controls supporting SOC 2, SOX, and internal policy.

2. What changed

Show operating improvements.

Example:

Evidence is now requested, submitted, reviewed, accepted, rejected, and linked to controls. Rejected evidence creates issues where remediation is required.

3. What improved

Show metrics.

Example:

Evidence acceptance improved from 72% to 86%. Duplicate requests decreased by 22%. Nine evidence gaps created issues. Three issues have been validated.

4. What remains weak

Be honest.

Example:

Four controls still lack clear evidence requirements. Two owners are overloaded. One legacy tracker remains active for internal audit requests.

5. What decision is needed

Ask for executive action.

Example:

Decision needed: approve expansion to vendor risk renewals and retire the remaining evidence tracker by the end of next quarter.

This is a strong Day 90 message.

It shows progress, evidence, gaps, and decisions.

Final thought

Connected GRC does not become real because a platform is configured.

It becomes real when work changes.

Risks have owners.
Controls have evidence.
Evidence has review status.
Rejected evidence creates issues.
Issues have remediation plans.
Remediation requires validation.
Dashboards use source records.
Executives see decisions needed.
Old trackers are retired.
The next workflow builds on the first.

That can begin in 90 days.

Not across the whole enterprise.

Not across every GRC domain.

But in one meaningful workflow that proves the model.

That is the right way to start Connected GRC.

Small enough to launch.

Important enough to matter.

Connected enough to scale.

Table of Contents
Related Product Areas

Linked Articles

GRC & Resilience
How to Implement Connected GRC in 90 Days Without Boiling the Ocean

Learn how to implement Connected GRC in 90 days by starting with a focused workflow, linking risks, controls, evidence, issues, dashboards, and owners without overbuilding.

Read Article
arrow_forward
GRC & Resilience
Where to Start With Connected GRC: The Right Implementation Sequence and Why It Matters

Learn where to start with Connected GRC, the right implementation sequence, and why data model, owners, intake, issues, evidence, risk acceptance, and dashboards must happen in order.

Read Article
arrow_forward
GRC & Resilience
GRC Program Health Checklist: 25 Questions to Ask This Quarter

Use this GRC program health checklist to assess owners, risks, controls, evidence, issues, vendors, incidents, dashboards, decisions, and Connected GRC maturity.

Read Article
arrow_forward
GRC & Resilience
How to Create a GRC Roadmap That Doesn’t Become a Transformation Theater

Learn how to create a practical GRC roadmap that delivers real operating value by connecting risks, controls, evidence, owners, issues, remediation, dashboards, and decisions.

Read Article
arrow_forward
GRC & Resilience
The Connected GRC Data Model: The Records Every Program Needs

Learn the core records every Connected GRC program needs, including risks, obligations, controls, evidence, issues, vendors, incidents, assets, audits, and dashboards.

Read Article
arrow_forward
GRC & Resilience
GRC Data Quality: Why Owners, Statuses, and Relationships Matter

Learn why GRC data quality depends on clear owners, statuses, relationships, evidence, issue lifecycle, risk acceptance, and dashboards executives can trust.

Read Article
arrow_forward
GRC & Resilience
The Connected GRC Program Charter: Roles, Responsibilities, and Decision Rights

Learn how to build a Connected GRC program charter that defines scope, roles, responsibilities, decision rights, ownership, escalation, dashboards, and governance.

Read Article
arrow_forward
GRC & Resilience
How to Build a GRC RACI That Actually Works

Learn how to build a practical GRC RACI that clarifies owners, approvers, reviewers, evidence responsibilities, issue remediation, risk acceptance, and executive reporting.

Read Article
arrow_forward
GRC & Resilience
How to Build a Connected GRC Operating Committee

Learn how to build a Connected GRC operating committee that connects risk, compliance, audit, cyber, privacy, third-party risk, resilience, evidence, issues, and decisions.

Read Article
arrow_forward
GRC & Resilience
How to Build a Connected GRC Intake Process

Learn how to build a Connected GRC intake process that routes risks, controls, vendors, AI, privacy, cyber, evidence, issues, exceptions, and regulatory changes to the right owners.

Read Article
arrow_forward
GRC & Resilience
How to Build GRC Workflows That Business Owners Will Actually Use

Learn how to build GRC workflows business owners will actually use by making intake, evidence, issues, vendors, AI, exceptions, and approvals clear, risk-based, and connected.

Read Article
arrow_forward
GRC & Resilience
Evidence Management in GRC: Building an Audit-Ready Evidence Trail

Learn how evidence management works in Connected GRC by linking evidence to controls, obligations, tests, audits, issues, remediation, owners, periods, and approvals.

Read Article
arrow_forward
GRC & Resilience
Issue Remediation and Validation: How to Prove the Fix Worked

Learn how issue remediation and validation work in Connected GRC by linking findings, root cause, owners, remediation plans, evidence, retesting, validation, and risk reduction.

Read Article
arrow_forward
GRC & Resilience
From Spreadsheet GRC to Connected GRC: A Migration Playbook

Learn how to migrate from spreadsheet-based GRC to Connected GRC by cleaning records, defining owners, linking risks, controls, evidence, issues, vendors, and dashboards.

Read Article
arrow_forward
GRC & Resilience
The Connected GRC Scorecard: Metrics Executives Should Actually Trust

Learn how to build a Connected GRC scorecard executives can trust by measuring risk appetite, evidence, issues, remediation, validation, vendors, AI, cyber, and decisions.

Read Article
arrow_forward

Frequently Asked Questions

Answers to common questions about SmartSuite’s pricing models, plan options, and onboarding programs.

What is a Connected GRC implementation checklist?

A Connected GRC implementation checklist is a practical guide for launching connected GRC workflows with defined owners, source records, statuses, evidence, issues, remediation, validation, dashboards, and measurable outcomes.

What should a Connected GRC implementation accomplish in the first 90 days?

The first 90 days should prove one connected workflow works, create a reusable data model, assign owners, launch a dashboard built from source records, and show measurable improvement.

What is the best first workflow for Connected GRC?

The best first workflow depends on the organization’s pain point. Common starting points include controls and evidence, issue remediation, third-party risk, executive dashboards, cyber risk, AI governance, operational resilience, regulatory inquiries, or SOX readiness.

Should every GRC record be migrated in the first 90 days?

No. The first 90 days should migrate only current, active, useful records needed for the first workflow. Stale or obsolete records should be archived or excluded unless they support current reporting or evidence needs.

Why is ownership important in Connected GRC implementation?

Ownership is critical because workflows depend on accountable risk owners, control owners, evidence owners, issue owners, vendor owners, dashboard owners, and decision owners. Without ownership, Connected GRC becomes another tracker.

What dashboard should be built first?

Build the dashboard that supports the first workflow. For controls and evidence, show evidence requested, submitted, accepted, rejected, overdue, issues created, remediation status, validation status, and decisions needed.

How do you measure 90-day Connected GRC success?

Measure duplicate requests reduced, evidence acceptance rate, overdue items, issues created and validated, manual reporting hours reduced, legacy trackers retired, dashboard usage, and decisions made from the workflow.

What is the biggest mistake in Connected GRC implementation?

The biggest mistake is trying to implement every GRC domain at once. Start with one high-value workflow, prove the model, retire old trackers, and then expand into adjacent workflows.

Put CRI Profile into action with SmartSuite

Map controls, collect evidence, run assessments, manage remediation, and report readiness - all from a single connected system.